On
page
48,
Dr.
Lee
explains:
"
...
the
integrity
of
a
landfill
cap
is
critical
to
the
prevention
of
leachate
generation.
Well-designed
and
installed
clay
caps
(often
combined
with
plastic
sheeting
in
Subtitle
D
landfills
as
discussed
below)
for
landfills
can,
especially
at
the
tirne
of
construction,
be
effective
in
reducing
the
rate
of
infiltration
of
moisture
through
the
cap
and
thereby
serve
to
aid
in
the
delay
[of]
leachate
generation
that
would
otherwise
be
promoted
by
moisture
from
in-
filtration.
However,
as
discussed
in
Lee
and
Jones-Lee's
'
Flawed
Technology'
review
referenced
elsewhere,
many
factors
affect
the
integrity
and
hence
functionality
of
even
a
well-designed
and
installed
clay
cap.
268
cont.
Comment
2:
Dr.
G.
Fred
Lee
concluded
that
the
waste
was
submerged
in
water
since
the
land-
fill
is
not
lined
and
the
water
infiltration
takes
place
through
the
banks
of
the
interior
drainage
channel
and
the
shores
of
the
Lagoon.
There
may
be
infiltration
under
Hwy
101
as
well.
Dr.
Lee
stated
that
it
didn't
make
sense
to
place
a
cap
over
the
Landfill
since
it
is
already
sitting
in
water.
Chemist
Dr.
Ron
Oremland
cornrnented
that
the
result
of
the
decaying
waste
being
in
contact
with
sea
water
would
create
hydrogen
sulfide
and
so
it
may
be
forming
in
the
landfill
and
needs
to
be
monitored
and
removed.
The
contradictory
nature
of
the
reports
included
in
the
DEIR
indicates
the
need
for
further
study
of
the
waste.
There
needs
to
be
a
resolution
to
a
num-
ber
of
issues
and
that
requires
a
new
study
to
reconcile
the
previous
studies
along
with
the
de-
tailed
mapping
of
the
groundwater
in
the
Landfill
and
an
explanation
of
what
will
be
done
with
VOC's
that
are
being
ignored.
The
DEIR
is
not
complete
because
it
does
not
resolve
these
is-
sues.
How
can
you
reduce
the
leachate
when
the
waste
rests
partially
in
water?
How
does
it
make
sense
to
think
that
leachate
can
be
reduced?
It
appears
that
there
is
a
strong
need
to
re-
grade
the
entire
landfill
area
to
make
a
surface
that
is
uniform
and
to
reach
a
level
just
above
the
waste
so
that
fill
above
that
level
can
be
engineered
and
have
an
integrity
that
will
be
well
under-
stood
by
geotechnical
engineers
and
regulators
rather
than
the
confused
mish
mosh
it
is
now.
A
goal
of
the
DLMP
is
to
collect
leachate
from
existing
and
future
identified
leachate
seeps.
If
monitoring
of
the
areas
where
seeps
were
not
found
previously
only
occurs
during
an
annual
or
semi-annual
walk
by,
how
will
future
seeps
be
found?
It
sounds
like
a
minimal
effort
to
locate
unknown
seeps
rather
than
a
careful
thorough
effort.
There
needs
to
be
a
requirement
for
a
more
aggressive
method
to
identify
seeps
at
the
IDC
,
on
the
shores
and
under
the
surface
of
shoreline
lagoon
water
and
on
the
east
side
of
the
Landfill
by
Hwy
101.
The
monitoring
for
seeps
must
occur
during
and
after
the
wet
season
including
after
rain
events
and
in
the
dry
season.
When
a
seep
is
found
there
must
be
prompt
action
to
ID
it
and
begin
to
divert
it.
None
of
these
more
prudent
measures
are
being
done
or
are
planned
for
and
that
does
not
guard
human
health
or
the
environment.
It
should
be
done.
The
Landfill
Leachate
diversion
system
is
deficient
in
the
following
ways:
It
rests
on
top
of
the
ground
and
is
therefore
not
secure
and
the
possible
underground
(under
water
surface)
seeps
in
the
Lagoon
have
not
been
investigated
despite
the
mention
in
the
appendix
that
they
probably
exist.
The
characterization
of
the
seeps
won
't
be
complete
until
that
Lagoon
investigation
is
done.
Geosyntec'
s
2012
Hazardous
Materials
Summary
Report
for
the
Landfill
(p.
17)
discusses
the
2008
Draft
Leachate
Management
Plan
(DLMP)
and
states
that
final
mitigation
measures
will
be
made
final
when
the
EIR
is
certified,
but
the
final
mitigation
measures
should
appear
in
the
Draft
EIR
so
that
they
may
be
viewed
and
cornrnented
on
by
the
public
and
other
agencies.