BBCAG
BBCAG
comments
on
DEIR
23
January
2014
page
55
Comment:
Is
this
a
new
planning
area?
These
areas
have
not
been
adequately
assessed
for
presence
of
toxins
and
while
you
skirt
this
issue
by
saying
it's
up
to
the
Standards
for
School
Site
Construction
guidelines
to
decide,
it
doesn't
have
a
fallback
position
should
a
school
need
to
be
constructed
off
site.
I
I
2
61
cont.
Subject:
4.G-101
,
Conclusion,
Impact
4.G-5
Comment
1:
There
does
not
appear
to
be
any
mitigation
measure
named
4.G-la
and
4.G-lb.
262
The
Airport
had
concerns
for
building
heights
out
at
Sierra
Point
While
not
within
2
miles
of
an
airport,
the
proposed
heights
of
buildings
may
need
to
be
reviewed.
Comment
2:
DEIR
states
the
project
site
is
located
more
than
two
miles
from
the
nearest
public
airport
and
is
not
located
within
an
airport
land
use
plan.
Since
the
tank
farm
is
a
major
part
of
airport
use
and
located
within
the
project,
this
DEIR
statement
is
incorrect
or
misleading.
2
6
3
Subject:
4.G-102,
Impact
4.G-6,
emergency
plan
Comment:
The
discussion
of
at-grade
rail
crossings
vs
overpasses
are
required
in
this
section
to
consider
conditions
in
the
event
of
an
earthquake.
Elevated,
engineered
roads
need
to
be
consid-
ered.
264
Subject:
Section
4.H,
stormwater
runoff
Comment:
Storm
runoff
has
the
potential
to
convey
heavy
metals,
VOCs,
hydrocarbons,
and
other
contaminants
into
the
lagoon
and
the
bay.
The
DEIR
states
(p.
4H-5)
that
water
quality
is
monitored
for
pH,
total
suspended
solids,
specific
conductance,
and
oil
and
grease.
The
"Report
on
the
Adequacy
of
the
Investigation/Remediation
of
the
Brisbane
Baylands
UPC
Property
Con-
tamination
Relative
to
Development
of
this
Property"
by
Dr.
G.
Fred
Lee
and
Dr.
Anne
Jones-
Lee,
dated
November
1,
2010,
concluded
that
"The
water
quality
monitoring
of
stormwater
run-
off
during
the
development
of
the
Brisbane
Baylands
area
should
be
significantly
expanded
to
enable
a
reliable
determination
of
the
extent
to
which
development
activities
result
in
the
mobili-
zation
of
hazardous
chemicals
into
the
runoff
waters"
(Lee,
p.
3).
"There
is
no
monitoring
of
stormwater
runoff
for
potentially
hazardous
chemicals
associated
with
the
concrete
rubble
recy-
cling
[specifically
PCBs
from
caulk]
or
the
landfill
surface"
(Lee,
p.
29).
Dr.
Lee
recommends
the
following
changes
to
the
stormwater
monitoring
program.
265
"We
have
found
that
the
monitoring
approach
prescribed
for
stormwater
runoff
from
landfill
ar-
eas
is
often
the
same
as
that
used
for
monitoring
runoff
from
urban
streets;
collection
of
a
single
grab
sample
at
some
time
during
each
of
several
storm
water
runoff
events
per
year
is
typically
required.
That
approach,
however,
is
neither
adequate
nor
in
keeping
with
programs
prescribed
by
the
US
EPA
(1992)
for
monitoring
stormwater
runoff
from
industrial
sites.
Landfill
areas
are
industrial
areas
and
should
be
monitored
as
such.
The
US
EPA
recommended
stormwater
runoff
monitoring
program
is
described
in
"U.S.
Environmental
Protection
Agency
(U.S.
EPA).
(1992).
NPDES
Stormwater
Sampling
Guidance
Document
(EP
A/833/B-92/001)
for
implementing
the
Agency
NP
DES
storm
water
management
program.
5-142
Previous Next