BBCAG
BBCAG
comments
on
DEIR
23
January
2014
page
39
The
Figures
on
p.
4.G-35ff,
along
with
similar
Figures
prepared
by
Geosyntec
in
April
2011
show
that
there
is
widespread
contamination
ofDichloroethene,
Trichloroethene
and
Tetra-
chloroethene
in
the
ground
water
under
the
area
proposed
for
medium
density
residential
flats,
and
there
is
widespread
lead
and
arsenic
deposited
from
1914-1960,
and
there
are
unnamed
other
volatile
organic
compounds
in
the
soil
under
the
proposed
flats.
Subject:
4.G-78ff,
Remedial
Actions
at
the
Project
Site
Comment
1:
The
following
description
is
from
the
February
2012
Geosyntec
Summary
Report
on
hazardous
materials
in
the
landfill:
The
Landfill
is
located
in
a
discharge
area
which
is
gener-
ally
characterized
by
upward
groundwater
vertical
hydraulic
gradient
on
Francisco
complex,
Old
Bay
Mud
(OBM)
and
Young
Bay
Mud
(YBM).
Above
YBM
are
located
Zone
A
alluvial
mate-
rials
and
the
area
below
YBM
contains
Zone
B
as
does
the
bedrock
Zone
B
represents
gradients
in
discontinuous
lenses
of
Aeolian/alluvial
sand
and
OBM.
The
Zone
A
groundwater
direction
and
flow
is
influenced
by
the
SF
Bay
and
the
IDC.
It
flows
from
the
north
and
west
to
IDC,
Guadalupe
lagoon
and
SF
Bay.
Zone
B
flows
to
north
and
south
in
the
dry
season
away
from
a
mound
near
MW35B
and
in
the
wet
season
it
flows
southeastward
toward
Lagoon
and
Bay.
9
Comment:
Much
is
made
of
the
artesian
conditions
under
the
landfill
and
it
is
used
as
a
justifica-
tion
to
believe
that
contaminants
are
not
entering
Zone
B
groundwater
but
no
explanation
is
given
for
the
presence
of
unionized
ammonia
in
the
Zone
B
deep
wells
in
August
2011
(MW
38B).
There
should
be
an
explanation
or
at
least
an
admission
that
the
reason
for
the
presence
of
the
unionized
ammonia
is
unknown
and
if
that
is
true
then
more
investigation
is
needed
to
ex-
plain
it.
It
also
means
that
the
EIR
is
not
complete
because
of
this
data
gap.
When
unexpected
contaminants
appear
without
explanation,
it
means
there
is
a
lack
of
under-
standing
of
the
contamination
and
the
physical
conditions.
The
Landfill
and
need
further
study
of
the
details
of
groundwater
flow
and
the
location
of
contaminants.
A
study
and
report
that
reconciles
contradictory
evidence
and
statements
in
past
environmental
reports
is
needed.
It
should
also
contain
explanations
of
anomalous
occurrences
involving
chemicals
of
concern.
Comment
2:
Geosyntec'
s
2012
HMSR
on
the
Landfill
(Section
4.6.1)
states
that
"A
human
health
risk
assessment
[HHRA]
has
not
been
performed
for
the
Brisbane
Landfill.
It
is
antici-
pated
that
once
landfill
redevelopment
plans
are
finalized,
the
HHRA
will
be
performed
....
"
This
intention
does
not
protect
human
health
because
it
isn't
clear
what
the
phrase
"
development
plans
are
finalized"
means.
In
relation
to
the
possibility
of
workers
excavating
before
that
time,
the
HHRA
needs
to
be
done
before
workers
begin
excavating,
grading,
etc.
Comment
3:
Screening
Level
Ecological
Risk
Assessments
(SLERAs)
were
performed
in
2003
and
2005
[see
Geosyntec'
s
2012
HMSR
on
the
Landfill
(Sections
4.6.2.1
and
4.6.2.2)].
These
SLERAs
are
out
of
date.
August
2005
is
nearly
nine
years
ago.
The
screening
should
be
done
at
known
seeps
and
at
suspected
but
yet
unverified
seep
locations
both
in
the
IDC
and
the
La-
goon.
Screening
should
be
done
in
the
wet
season
after
rain
events.
The
screening
is
out
of
date
and
incomplete
and
more
should
be
done
to
adequately
understand
extent
and
complete
nature
of
seep
contaminants.
There
should
be
testing
of
benthic
organism
s
in
the
lagoon
to
check
for
con-
5-126