BBCAG
BBCAG
comments
on
DEIR
23
January
2014
page
29
Subject:
4.G-32
and
33,
Table
4
.G-2
and
Table
4.G-3
Comment:
While
the
DEIR
notes
how
many
of
the
listed
substances
don
'
t
have
MCL's,
it
fails
to
tell
how
many
substances
have
not
been
tested
or
exactly
which
"chemical
compounds
[are]
not
included
in
this
table.
"
Refer
to
G.F.
Lee's
report
regarding
exposure
to
untested,
unknown
substances.
1
38
Secondly,
there
is
no
discussion
of
cumulative
impacts
of
exposure
to
multiple
toxins_
Subject:
4.G-33,
2
11
d
paragraph":
"The
landfill
gas
control
system
has
been
in
place
since
at
least
2002
...
"
Comment
1:
The
Waste
Discharge
Requirements
and
Abatement
Order
01-041
states
that
the
LFG
system
was
installed
"between
1990
and
1991
_
__
which
consisted
of
perimeter
horizontal
headers
with
vertical
extraction
wells
and
horizontal
'finger
'
wells
encircling
Sunquest's
portion
of
the
site.
"
(pg
4,
item
15
of
01-041)
I
139
14
0
This
is
important
information.
It
speaks
to
the
age
and
the
technological
limitation
of
what
the
LFG
system
can
do.
It
is
not
all-inclusive
of
the
landfill
portion,
because
it
wasn
't
installed
in
areas
in
the
north
(the
Van
Arsdale
and
Recology
operations,)
and
is
limited
by
the
times
the
system
shuts
down.
Comment
2:
Please
provide
documentation
of
the
landfill
areas
in
which
methane
gas
is
and
was
detected.
Subject:
4.G-11:
"
T,FG
control
facilities
at
the
former
Rrishane
l,andfill
were
operating
satis-
factorily.
"
Comment:
It
is
incorrect
to
leave
the
impression
that
the
interim
methane
system
is
adequate_
Refer
to
comments
about
off-gassing
during
mechanical
shutdowns_
14
2
I
141
What
would
be
beneficial
is
discussion
of
the
location
of
the
burner
and
what
toxic,
hazardous
substances
the
public
is
exposed
to
and
for
what
duration
of
time.
Discussion
as
to
whether
there
might
be
other
systems
needed,
or
improved
existing
systems
and
their
scale
is
required
and
beneficial.
Subject:
4.G-34:
"although
other
subsequent
uses
may
have
also
contributed.
"
Comment:
Proper
characterization
of
the
site
is
important
and
those
"subsequent
uses"
include
a
Stauffer
Chemical
Company,
which
produced
herbicides
and
elemental
phosphorus
during
that
period
and
a
Frey'
s
Tannery.
Other
areas
include
jet
fuel
leaks
(PCE)
along
the
lagoon
and
a
sewerage
plant
(bacteria)
which
were
cited
for
releases
and
overflows.
This
omitted
information
would
help
determine
what
contaminants
should
be
tested
and
remediated_
Near
the
Stauffer
Chemical
plant,
they
only
tested
for
Bunker
C
and
VOC'
s_
Lack
of
this
information
could
put
the
public
at
risk
due
to
unrecognized
hazards_
Subject:
4.G-35
to
-47,
Figures
4.G-6a
through
-6m
J
l4
4
143
5-116
Previous Next