BBCAG
BBCAG
comments
on
DEIR
23
January
2014
page
18
Subject:
4.G-9,
Air
Quality
Solid
Waste
Assessment-1990:
"The
analytical
results
indicated
that
air
contaminants
apparently
were
not
emitted
from
the
landfill
into
the
ambient
atmosphere
at
levels
that
would
be
likely
to
pose
a
potential
threat
to
public
health
or
safety
or
the
threat
to
the
environment."
Comment:
It
is
incorrect
to
assume
that
a
few-day
readings
leads
to
"no
threat
to
the
public_"
The
methane
system
works
by
keeping
a
vacuum
on
the
volatile
vapors_
The
system
shuts
down,
the
methane
and
toxic
gas
vapors
escape
into
the
atmosphere_
A
mitigation
system
greater
than
a
few-foot
clay
cap
needs
to
be
required.
Subject:
4.G-13,
Soil
Conditions
Summary
-
2005,
"Metals
were
detected
in
shallow
soils
in
all
of
the
51
locations
sampled
across
the
entirety
of
....
the
metals
are
widespread
because
the
area
was
filled
with
rubble
and
debris
in
the
early
1900s.
"
Comment:
This
report
is
supposed
to
be
in
Appendix
A-11
,
but
Appendix
A-11
includes
only
the
first
page
of
a
report
plus
some
tables_
Why
was
the
portion
of
the
report
that
was
cited
not
included
in
the
appendix?
Subject:
4.G-13,
Wetland
Mitigation
Plan-2004:
"Proposed
maintenance
activities
focused
on
promoting
wetland
habitat
establishment
...
The
wetland
mitigation
plan
was
not
implemented
and
federal
permits
have
since
lapsed.
"
Comment:
The
wetland
studies
were
minimal
at
best.
They
did
not
include
upland
areas
that
support
the
wetlands
that
were
measured.
This
is
an
unmitigated
impact
of
an
interim
measure.
The
City
of
Brisbane
has
a
General
Plan
ordinan
ce
that
allows
for
mitigation
for
the
loss
of
wet-
lands
in
excess
of
1:
1.
This
has
had
a
significant
impact
on
wildlife
and
should
be
mitigated.
Subject:
4.G-16,
Leachate
Management
Plans
2002-2008:
"
The
primary
method
for
long-term
leachate
management
at
the
Brisbane
Landfill
is
to
reduce
leachate
generation
through
the
con-
struction
of
a
low-permeability
final
cover.
Construction
of
the
final
cover
will
reduce
leachate
generation
by
approximately
90
percent.
"
Comment
1
:
This
statement
is
incorrect.
When
groundwater
passes
through
the
landfill,
leachate
is
generated.
Preventing
it
from
infiltration
from
above
"is
pointless"
per
Dr.
G.F.Lee.
Comment
2:
What
is
the
life
of
the
cover
and
what
research
shows
this
time-frame
use
under
project
conditions?
What
steps
will
be
taken
to
monitor
integrity
of
cover
and
how
will
cover
be
replaced?
In
sections
or
in
entirety
at
one
time?
How
will
this
be
paid
for?
Also,
the
need
for
such
cover
advises
leachate
and
pollution
WILL
continue
to
be
a
problem
during
the
life
of
the
project.
How
is
this
conveyed
in
the
DEIR?
Subject:
4.G-17,
Landfill
Groundwater,
Surface-Water
and
Leachate
Monitoring,
2002-Present:
"the
Young
Bay
Mud
that
separates
the
shallow
and
deep
groundwater
zones,
along
with
the
upward
hydraulic
gradient
prevents
contamination
of
the
deep
groundwater
zones.
"
J
5-105