BBCAG
BBCAG
comments
on
DEIR
23
January
2014
page
14
public
that
the
developer
had
been
held
accountable
by
the
City
of
Brisbane
and
the
State
and
County
regulators_
The
DEIR
does
not
include
any
means
to
provide
public
reassurance
that
the
mitigations
have
been
done
and
that
they
work
as
planned_
Subject:
4E-24,
25,
characterization
of
soils
Comment:
Will
sea
level
rise
have
an
impact
on
shrink-swell
behavior
on
or
near
the
site?
What
additional
hazards
could
be
encountered
with
a
10
foot
rise
in
sea
level,
and
what
changes
might
be
necessary
to
avoid
them?
If
the
amount
of
moisture
in
the
soil
affects
the
severity
and
rate
of
corrosion,
then
what
meas-
ures
need
to
be
taken
to
anticipate
sea
level
rise?
Subject:
4.E-36,37,
hnpact
4
.E-1
Comment:
DEIR
states
there
are
no
known
earthquake
faults
with
the
project
site
and
the
pro-
posed
development
will
not
expose
people
or
structures
to
substantial
adverse
effects,
etc_
66
con
t
.
The
project
is
on
landfill
and
mud
as
are
the
SF
and
Berkeley
marinas
_
No
fault
line
runs
through
either
location
but
both
were
severely
damaged
in
a
recent
7.0
earthquake_
The
7.0
quake
was
listed
by
Berkeley
as
9.
0
on
their
marina_
The
city
of
SF
experienced
conflagration
fires
in
their
marina,
a
lack
of
water
delivery
with
subsequent
fireboat
use
to
stop
the
fires.
DEIR
should
state
mitigation
IS
required_
In
addition,
the
pipeline
traversing
the
bay
to
move
petroleum
into
the
tank
farm
definitely
does
fall
into
a
quake
zone,
and
these
pipelines
could
cause
quite
a
problem
for
the
baylands.
6
9
Subject:
4.E-38,
Impact
4.E-2:
"
...
strong
groundshaking
could
potentially
compromise
the
sta-
bility
of
the
final
landfill
cap
...
.
"
70
Comment:
How
would
the
landfill
cap
be
checked
for
damage
or
deterioration?
What
would
signify
a
breach?
Who
would
be
qualified
to
determine
whether
a
breach
occurred?
Subject:
4.E-38,
Mitigation
measure
4.E-2a,
requiring
a
site-specific
geotechnical
report
Comment:
Please
add
more
detail
on
what
would
be
required
for
a
site-specific
geotechnical
report.
How
many
borings
would
be
required,
i.e.,
borings
will
be
required
at
what
intervals?
How
deep
would
they
have
to
go?
How
far
outside
the
building
footprint
should
borings
be
re-
quired?
What
measures
would
have
to
be
taken
to
ensure
that
cross-contamination
of
water-
bearing
layers
does
not
result
from
the
process
of
boring
or
driving
piles
or
other
foundation
work?
Subject:
4.E-41,42,
Impact
4.E-4,
discussion
oflandslides
Comment:
The
DEIR
cites
a
Treadwell
&
Rollo
report
from
2008
that
"
...
concluded
that
the
placement
of
engineered
fill
may
cause
underlying
Bay
Mud
to
faiL"
Exactly
what
does
"failure"
mean
in
this
context?
For
many
years,
consultants
for
the
landowner
have
argued
that
Bay
Mud
72
71
5-101
Previous Next