BBCAG
BBCAG
comments
on
DEIR
23
January
2014
page
11
greater
than
was
evaluated,
the
conclusion
is
not
useful
and
the
analysis
is
incomplete.
The
plan
is
to
leave
metal
contamination
(arsenic,
lead,
nickel)
under
roadways
or
parking
lots.
Those
roadways
and
the
sidewalks
bracketing
them
will
be
in
pieces
after
a
great
quake
potentially
ex-
posing
the
public
to
the
heavy
metals
and
hydrocarbons.
Additional
study
and
analysis
is
needed
to
understand
how
buildings
(whether
on
piles
or
not),
infrastructure
and
utilities
will
be
im-
pacted
by
a
ten
times
larger
earthquake.
A
study
and
understanding
are
needed
of
what
will
be
the
impact
on
the
rail
lines,
trains,
gasoline/aviation
pipelines,
gasoline
storage
tanks
on
or
adja-
cent
to
the
Baylands
of
a
quake
that
is
much
stronger
than
they
were
designed
for.
This
project
places
thousands
of
people
in
greater
risk.
The
DEIR
under-represents
the
risk
ofloss
of
life
and
property
damage
due
to
a
seismic
event
Further
investigation
and
analysis
is
needed
to
represent
the
actual
risk.
The
DEIR
appendices
state
that
extensive
excavation
could
cause
alterations
to
the
groundwater
flow
regimen
and
ground
water
recharge.
Comment:
This
kind
of
alteration
could
also
be
caused
by
a
major
earthquake.
The
result
of
this
type
of
alteration
would
mean
that
monitoring
wells
might
no
longer
function
and
remediation
efforts
could
not
be
judged
effective
or
not
A
mitiga-
tion
is
needed
for
this
possibility.
A
system
must
be
devised
that
would
allow
for
a
rapid
re-
placement
of
monitoring
wells
to
determine
if
chemicals
of
concern
and
heavy
metals
were
mov-
ing
toward
the
Bay.
In
the
past,
circumstances
have
occurred
related
to
remediation
injection
techniques
that
altered
the
artesian
effects
that
are
present
beneath
the
site.
Since
some
of
the
remediation
effectiveness
is
predicated
on
the
current
regime
and
recharge,
it
won'
t
be
as
effec-
tive
as
planned.
Mitigation
is
required.
The
hazard
applies
to
all
areas
of
the
Bay
lands.
.
Comment
2:
The
applicant's
Infrastructure
Plan,
p.
10,
under
site
grading,
records
a
net
increase
of
700,000
cubic
yards
of
material
accumulated
on
the
landfill
since
2007
when
the
aerial
topog-
raphic
survey
was
done.
This
information
originates
in
the
Infrastructure
Plan
that
was
done
in
early
2011.
Much
more
material
has
accumulated
in
the
2-1/2
years
since
the
Plan
was
written.
Current
in-
formation
is
needed
to
understand
current
conditions.
A
new
aerial
topographical
map
is
needed.
The
mitigation
measures
must
be
applied
to
the
conditions
that
exist
when
the
mitigation
meas-
ures
are
taken
otherwise
there
is
no
reason
to
believe
they
will
be
effective.
The
analysis
that
was
used
to
create
them
no
longer
applies.
It
should
be
redone
since
this
deficit
means
the
DEIR
is
incomplete.
Comment
3:
In
regard
to
recommendation
in
Geosyntec
Landfill
report
(2012,
Hazardous
Mate-
rials
Summary
Report)
about
using
deep
or
shallow
building
foundations,
it
seems
clear
that
the
recommendations
in
this
landfill
report
do
not
take
into
account
the
seismic
risks
of
either
a
rich-
ter
8M
or
9M
earthquake
on
the
nearby
San
Andreas
Fault
Seismic
issues
are
not
mentioned
at
all.
Maximum
credible
earthquake
has
been
predicted
as
possible.
A
1977
J.V.
Lowney
&
Assoc.
report
regarding
geotechnical
issues
concluded
that
commercial
and
industrial
development
was
possible.
The
level
of
knowledge
of
geology/hydrology
of
the
Baylands
and
of
Seismology
has
changed
and
the
standards
in
geotechnical
engineering
have
changed
significantly
since
1977.
A
conclusion
made
36
years
ago
should
not
be
relied
on
to-
day.
The
information
on
earthquake
risk
is
outdated
and
new
analysis
is
needed
to
include
the
5-98