The
fact
that
the
Diesel
Risk
Reduction
Plan
and
subsequent
CARB
recommendations
are
con-
sidered
"advisory
and
should
not
be
interpreted
as
defined
'buffer
zones
...
'"
raises
the
question
of
the
ability
for
this
document
to
evaluate
planning
policies
and
mitigation
measures
adequate
to
protect
human
health.
Ignoring
the
planning
opportunity
is
contrary
to
Brisbane's
General
Plan
Program
203a
as
well
as
Caltrans
and
school
authorities
who
have
established
specific
setback
requirements,
away
from
freeways
and
industrial
dischargers
for
housing,
schools,
hospitals,
etc.
The
transit-friendly,
mixed-use
planning
for
this
area
fails
to
acknowledge
that
traffic
and
exist-
ing
toxic
air
contaminant
dischargers
will
have
multiplying
impacts
on
the
new,
proposed
densi-
ties
and
users.
Subject:
4.B-17
to
18,
Impact
Assessment
Methodology
Comment:
Methodologies
and
underlying
assumptions
are
important.
The
Environmental
Set-
ting
did
not
mention
air
conditions,
such
as
"dust
devils"
and
high
winds
that
occur
out
on
the
Baylands,
that
circulate
contaminated
soils
from
areas
that
have
not
been
capped
or
contained
by
any
remediation
program.
It
doesn
't
mention
that
air-borne
soils
coming
from
the
Northeast
Ridge
contain
arsenic
levels
not
suitable
for
residential
uses
even
though
they
are
not
identified
as
a
stationary
source
polluter
because
it
is
naturally
occurring.
Subject:
4.B-17
to
18,
Health
Risks
and
Hazards
Comment:
Communities
near
contaminated
landfills
should
have
Community
Health
Surveys
and
baseline
studies
done
before
the
use
of
modeling
of
future
health
risks
and
hazards.
Under-
stated
impacts,
the
myriad
of
impacts
from
unregulated
chemicals,
the
gaps
in
regulatory
leader-
ship
ALL
means
the
public
has
greater
health
risks
than
calculated
with
these
methods.
26
27
28
A
mitigation
measure
to
require
a
local
dust
monitoring
program
and
control
of
dust
through
hy-
dro-seed
planting
large
un-vegetated
areas
should
be
considered.
Subject:
4.B-21
,
Mitigation
Measure
4.B-1
,
Basic
Controls,
Item
1.
Comment:
Soil
piles
and
exposed
Baylands
ground
surfaces
need
better
dust
control,
both
in-
terim
and
long
range.
Occasional
watering
is
not
adequate.
Tarping
and
tenting
exposed
ground,
limiting
the
number
of
trips
or
times
soil
is
moved
(Impact
4.B-2,
The
Grading
Plan)
and
requir-
ing
landscaping/hydroseeding
programs
would
be
beneficial
mitigation
measures
not
considered
in
this
document.
Subject:
4.B-26
to
27,
Conclusion,
Mitigation
Measures
4.B-2a
and
4.B-2b
Comment:
Air
Quality
impacts
from
construction,
while
significant,
can
be
avoided
100%
by
the
no
project
alternative.
Disallowing
earth-moving
activities
on
windy
days
and
requiring
all
earth-moving
and
infrastructure
to
be
completed
before
any
occupancy
or
new
uses
are
permit-
ted,
are
measures
which
would
reduce
exposure
to
particulates
and
associated
public
health
risks.
Subject:
4.B-29
to
31
,
Impact
4.B-3
Toxic
air
exposure
30
29
i
31