SFPUC
cumulative
analysis
for
the
proposed
water
transfer
resulting
in
additional
djversion
from
the
Tuolumne
River
should
assume
that
the
SFPUC
WSIP
is
completed
and
in
place;
therefore
assuming
the
Regional
Water
System
is
delivering
265
mgd
annual
average
and
the
SFPUC's
2
mgd
transfer
with
MIDrrID
is
a
reasonably
foreseeable
project.
Page
4.0-40
acknowledges
that
implementing
the
CID-Brisbane
transfer
results
in
a
reduction
in
flow
on
the
Tuolumne
River
between
O'Sbaughnessy
Dam
and
Don
Pedro
Reservoir.
Page
6-47
also
acknowledges
that
transfers
that
would
make
use
of
the
SFPUC's
system
could
result
in
flow
effects
on
the
Tuolumne
River.
This
EIR
should
identify
the
flow
effects
on
the
Tuolumne
River
if
the
proposed
OID-Brisbane
water
transfer
agreement
was
to
go
forward.
The
effects
on
the
Tuolumne
River
flow
should
be
described
at
a
project
level
and
should
identify
rrutigation
measures
to
reduce
potential
impacts
and
a
cumulative
analysis
which
takes
into
consideration
reasonably
foreseeable
projects
should
be
conducted.
Project
level
and
cumulative
potential
impacts
in
topic
areas
listed
in
Comment
2
should
be
addressed
and
mitigation
measures
should
be
identified
for
those
impacts.
The
analysis
should
include
a
description
of
potential
impacts
that
may
occur
during
a
multi
year
drought.
Please
conduct
the
analysis
assuming
the
longest
drought
on
record.
Comment
WS-11
The
project
includes
construction
and
operation
of
an
onsite
recycled
water
plant,
which
would
provide
tertiary
treatment
of
wastewater
for
recycled
water
re-use
within
the
Project
Site.
Will
the
recycled
water
be
used
for
other
non-
potable
uses
in
addition
to
irrigation?
Please
provide
a
brief
description
of
how
the
recycled
water
plant
would
be
operated.
Please
provide
estimates
of
irrigation
requirements
for
each
development
scenario.
The
recycled
water
plant
may
not
be
constructed
until
year
15
of
the
20
year
build
out
(page
Would
water
from
the
proposed
water
supply
agreement
be
used
for
irrigation
or
other
non-potable
water
use
during
the
first
15
years
of
development?
Please
break
down
the
water
supply
needs
of
each
development
scenario
and
describe
how
the
water
supply
demands
will
be
met.
For
example
identify
the
irrigation
needs
under
each
development
scenario
and
describe
if
the
irrigation
needs
will
be
met
with
water
from
the
proposed
water
supply
transfer
or
with
recycled
water.
Comment
WS-12
As
mentioned
in
the
comments
above,
the
analysis
of
the
proposed
water
supply
agreement
should
identify
potential
impacts
at
a
project
level
that
may
result
from
increased
diversion
of
water
from
the
Tuolumne
River
between
O'
Shaughnessy
Dam
and
Don
Pedro
Reservoir.
The
following
sections
of
the
EIR
should
be
revised
to
include
a
project
level
analysis
of
potential
impacts
of
the
water
supply
agreement;
4.A
Aesthetics
and
Visual
Resources,
4.C
Biological
Resources,
4.E
Geology,
Soils,
and
Seismicity,
4.H
Surface
Water
Hydrology
and
Water
Quality,
4.M
Recreational
Resources,
4.0
Utilities,
Service
Systems,
and
Water
Supply,
and
4
.P
Energy
Resources.
A
cumulative
analysis
for
each
of
these
topic
areas
should
also
be
conducted.
Project
level
and
cumulative
analyses
should
identify
potential
impacts
of
operating
the
water
supply
transfer
during
normal
years
and
multi
year
droughts.
5-83