SFPUC
measure
4.0-la
whlch
requires
that
water
storage
facilities
are
constructed
and
connected
to
the
project
site's
water
delivery
system
(page
4.0-38)
and
the
Project
would
require
the
construction
of
new
or
expanded
local
water
storage
and
conveyance
infrastructure
(page
4.0-47).
The
EIR
should
identify
facility
improvements
and
new
facilities
that
would
be
required
for
reliable
water
supply.
Impacts
related
to
facility
improvements
and
new
water
supply
facilities
should
be
identified
in
this
EIR.
Comment
WS-6
Page
4.0-44
states
that
at
times
the
SFPUC
system
is
operating
at
full
capacity
and
may
not
have
the
capacity
to
deliver
the
water
transfer
to
the
City
of
Brisbane.
How
the
water
supply
transfer
would
be
operated
during
these
times
should
be
described
in
the
project
description.
The
SFPUC
uses
the
San
Joaquin
Pipeline
(SJPL)
as
the
metric
for
determining
capacity
of
the
SFPUC's
Regional
Water
System
and
illustrating
diversions
from
the
Tuolumne
River
(WSIP
Program
EIR,
Appendix
03,
page
03-12).
There
are
three
occurrences
when
the
SJPL
would
not
have
supplemental
capacity
to
allow
for
transmission
of
the
proposed
water
supply
component
of
this
project;
l)
SJPL
is
operated
at
full
capacity
to
meet
customer
demand
and
local
reservoir
replenishment
(See
WSIP
Program
ElR
pages
2-23,
and
29,
and
5.1-10
regarding
local
reservoir
replenishment),
2)
SJPL
capacity
is
reduced
due
to
maintenance
(See
WSIP
Program
EIR
pages
2-27
and
through
regarding
WSIP
maintenance),
and
3)
emergencies.
The
operations
of
the
OID-Brisbane
water
transfer
should
be
described
in
greater
detail
and
take
into
account
times
when
the
SFPUC's
Regional
Water
System
is
operating
at
full
capacity
and
at
reduced
capacity
due
to
maintenance.
The
water
transfer
component
should
be
described
in
greater
detail
and
potential
environmental
impacts
associated
with
the
water
transfer
component
of
the
project
should
be
identified
in
the
EIR.
In
addition
to
providing
a
more
detailed
description
of
the
water
supply
component
of
the
project,
answers
for
the
following
questions
should
be
provided.
Do
you
have
an
estimate
of
the
amount
storage
that
would
be
required,
either
in
one
of
SFPUC's
reservoirs
or
in
a
storage
facility
developed
by
this
project,
when
the
SFPUC
system
is
operating
at
fuU
capacity
or
will
be
shut
down
for
maintenance?
Would
the
sizing
of
the
storage
facility
account
for
times
of
emergency
or
water
quality
events
that
may
result
in
being
unable
to
implement
the
transfer?
Would
the
new
storage
facility
be
sized
to
meet
fire
protection
needs
and
peak
day
demand?
Would
the
storage
facility
by
used
for
dry
year
or
drought
supply?
What
are
the
sizing
requirements
for
the
new
storage
facility?
To
meet
project
water
needs
during
all
times,
including
times
of
drought,
emergency,
or
peaking
wou
ld
storage
in
one
of
SFPUC's
reservoirs
be
required?
For
the
SFPUC
to
use
this
EIR
to
enter
into
agreements
with
the
City
of
Brisbane
on
water
supply
this
ElR
should
describe
the
proposed
water
supply
operations
and
identify
any
direct,
indirect
and
secondary
effects
of
providing
a
new
water
supply,
including
impacts
associated
with
construction
of
new
storage
tanks,
other
facility
improvements
or
new
facilities,
and
any
other
storage
or
conveyance
requirements.
5-81