4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Traffic
and
Circulation
(cont.)
Bicycle
circulation.
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.N-11:
Prior
to
issuance
of
the
first
building
occupancy
permit
for
new
development
other
than
improvement
or
relocation
of
an
existing
use
within
the
Project
Site,
roadways
and
trails
shall
provide
for
safe
accessibility
for
bicycles
to
buildings
and
recreational
areas
throughout
the
Project
Site,
including
connections
to
offsite
bicycle
routes
and
trails.
In
addition,
Project
Site
land
uses
shall
provide
bicycle
parking
in
appropriate
areas
(i.e.,
where
they
will
get
the
most
use,
where
security
is
maximized,
and
where
pedestrian
circulation
is
minimally
affected
by
their
presence).
The
minimum
standards
contained
in
this
mitigation
measure,
along
with
the
equivalent
bicycle
access
as
that
shown
in
Table
4.N-7,
shall
be
included
in
any
specific
plan
approved
for
development
within
the
Project
Site.
In
addition,
details
of
Project
Site
development-provided
bicycle
parking
spaces
(number
and
location)
shall
be
determined
at
the
time
when
site-specific
development
projects
are
proposed
pursuant
to
the
adopted
Specific
Plan,
and
shall
adhere
to
the
following
guidelines
which
shall
also
be
included
in
any
specific
plan
adopted
for
development
within
the
Project
Site:
Bicycle
parking
shall
be
placed
within
50
feet
of
building
and
facility
entrances,
where
it
can
be
well-
lit,
clearly
visible,
and
out
of
the
primary
travel
path
of
pedestrians.
Retail
shopping
centers
and
supermarkets
shall
include
one
Class
I
rack
(covered
bicycle
locker
for
long-term
parking)
per
30
employees,
and
one
Class
II
rack
(able
to
secure
both
the
frame
and
at
least
one
wheel
of
a
bicycle
for
short-term
parking)
per
6,000
square
feet
of
retail
space.
Parks
and
recreational
fields
normally
shall
include
one
Class
I
rack
per
30
employees
and
one
Class
II
rack
per
9
users
(during
peak
daylight
times
of
peak
season).
Transit
centers
normally
shall
include
individual
parking
spaces
equal
to
2
percent
of
daily
boardings
(75
percent
Class
I
and
25
percent
Class
II).
Applicants
for
specific
plan(s)
shall
include
the
required
language
in
proposed
specific
plans,
including
timing
for
construction
of
improvements
and
establishment
of
needed
funding
of
capital
costs
and
ongoing
operations
and
maintenance.
Specific
Plan(s):
City
Council
The
City
shall
not
adopt
any
specific
plan
or
approve
any
site-specific
development
project
that
would
does
not
meet
the
requirements
of
Mitigation
Measure
4.N-11.
The
Community
Installation
of
the
Development
Director
shall
improvements
called
for
in
review
the
required
Mitigation
Measure
4.N-11.
specific
plan
language
for
compliance
with
Mitigation
Measure
4.N-11
prior
to
public
hearings
on
the
specific
plan.
The
conditions
of
approval
for
each
site-specific
development
approval
prior
to
construction
of
the
improvements
called
for
in
Mitigation
Measure
4.N-11
shall
include
a
requirement
for
construction
of
these
improvements
prior
to
issuance
of
a
building
occupancy
permit.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Brisbane
Baylands
Final
EIR
4-94
May
2015