4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Traffic
and
Circulation
(cont.)
As
a
condition
of
approval
for
the
first
discretionary
action
taken
for
development
within
the
Project
Site,
the
applicant
shall
be
required
to
initiate
a
corridor
plan
for
Bayshore
Boulevard
in
cooperation
with
Daly
City
and
San
Francisco
to
determine
the
suite
of
improvements
necessary
to
resolve
long-term
cumulative
traffic
issues
along
the
corridor.
Because
the
effectiveness
of
such
a
corridor
plan
would
necessitate
participation
by
Daly
City
and
San
Francisco
in
recognition
of
increases
in
traffic
along
the
Bayshore
corridor
that
will
be
generated
by
future
development
within
those
two
jurisdictions,
Brisbane
will
also
make
its
best
efforts
to
assist
the
developer
in
securing
the
agreement
of
Daly
City
and
San
Francisco
to
participate
in
the
corridor
study
and
its
implementation.
Because
the
required
improvements
are
outside
of
Brisbane,
permission
to
construct
the
improvements
called
for
in
Mitigation
Measure
4.N-3a
must
be
secured
from
the
City
of
Daly
City.
The
City
Engineer
shall
work
with
the
applicant
to
secure
such
permission.
If
Daly
City
agrees
to
the
improvements
called
for
in
Mitigation
Measure
4.N-3a,
the
City
Engineer
shall
inform
the
Brisbane
Building
Official
upon
completion
of
required
improvements
that
occupancy
permits
may
be
issued.
If
Daly
City
does
not
agree
to
the
improvements
called
for
in
Mitigation
Measure
4.N-3a,
the
City
Engineer
shall
inform
the
Brisbane
Building
Official
that
occupancy
permits
may
be
issued
upon
written
confirmation
from
Day
City
that
such
improvements
will
not
be
permitted
to
be
constructed.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Brisbane
Baylands
Final
EIR
4-84
May
2015
Previous Next