Significant
Impact
Being
Mitigated
Traffic
and
Circulation
(cont.)
Building
Official
upon
completion
of
required
improvements
that
occupancy
permits
may
be
issued.
If
San
Francisco
does
not
agree
to
the
improvements
called
for
in
Mitigation
Measure
4.N-1d,
the
City
Engineer
shall
inform
the
Brisbane
Building
Official
that
occupancy
permits
may
be
issued
upon
written
confirmation
from
San
Francisco
that
such
improvements
will
not
be
permitted
to
be
constructed.
Increased
traffic
at
intersections
causing
them
to
operate
below
acceptable
levels
of
service
Existing
plus
Project
conditions.
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.N-1e:
The
following
physical
improvements
shall,
to
the
extent
permitted
by
agencies
with
jurisdiction
over
this
intersection,
be
constructed
and
accepted
for
public
maintenance
prior
to
issuance
of
occupancy
permits
for
any
site-specific
development
that
would
(1)
result
in
reducing
the
intersection
to
below
the
acceptable
LOS
standard,
or
(2)
contribute
additional
traffic
to
the
intersection
if
it
is
already
operating
below
the
acceptable
LOS
standard.
A
signal
phase
shall
be
provided
for
the
westbound
right
approach
at
the
intersection
of
Tunnel
Avenue
&
Bayshore
Boulevard,
and
signal
timing
settings
for
the
AM
and
PM
peak
periods
shall
be
modified
by
changing
the
southbound
left
phase
from
the
existing
permitted
to
protected
phase,
and
shifting
20
seconds
of
green
time
from
the
northbound
and
southbound
movements
to
each
of
the
southbound
left
and
westbound
right
phases
Baylands
developer
City
of
Brisbane
City
Engineer
The
City
Engineer
shall
maintain
annual
traffic
counts
to
monitor
traffic
conditions,
and
shall
provide
for
traffic
analyses
of
site-specific
development
proposals
to
determine
when
the
requirements
of
Mitigation
Measure
4.N-1e
are
to
be
applied.
If
the
requirements
of
Mitigation
Measure
4.N-1e
apply
to
a
site-specific
development,
the
City
Engineer
shall
inform
the
City
Building
Official,
who
shall
not
issue
occupancy
permits
for
the
develop-
ment
until
notified
by
the
City
Engineer
that
the
requirements
of
Mitigation
Measure
4.N-1e
have
been
satisfied.
Installation
of
the
physical
improvements
required
by
Mitigation
Measure
4.N-1e
or
written
confirmation
from
San
Francisco
that
such
improvements
will
not
be
permitted
to
be
constructed.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Brisbane
Baylands
Final
EIR
4-80
May
2015