4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Noise
and
Vibration
(cont.)
Site
design
measures,
including
use
of
building
orientation
to
minimize
window
exposure
toward
noise
sources,
avoid
placing
balcony
areas
in
high
noise
areas,
and
use
of
buildings
as
noise
barriers;
Use
of
acoustically
rated
building
materials
(insulation
and
windows);
Construction
of
architectural
noise
barriers
between
sources
and
receptors;
and
Provision
of
landscaping
or
other
non-noise-
sensitive
buffer
zones
between
sources
and
receptors.
Exposure
of
onsite
residents
to
vibration
from
rail
operations.
DSP
and
DSP-V
scenarios.
Measure
4.J-2a:
All
development
in
the
Baylands
shall
be
designed
to
avoid
vibration
from
Caltrain
operations
in
excess
of
72
VdB
for
residences.
Prior
to
issuance
of
any
building
permit
for
structures
intended
for
human
occupancy
within
200
feet
of
the
mainline
track,
a
detailed
vibration
design
study
shall
be
completed
by
a
qualified
acoustical
engineer
to
confirm
the
ground
vibration
levels
and
frequency
content
along
the
Caltrain
tracks
and
to
determine
appropriate
design
to
limit
interior
vibration
levels
to
72
VdB
for
residences.
Implementation
of
the
recommended
measures
of
the
acoustical
study
into
project
design
elements
shall
be
verified
by
the
Brisbane
Building
Department
as
part
of
the
plan-check
process.
Specific
measures
to
achieve
the
performance
standards
set
forth
above
shall
include
all
or
any
combination
of
the
following
methods:
Use
of
vibration
isolation
techniques
such
as
supporting
the
new
building
foundations
on
elastomer
pads
similar
to
bridge
bearing
pads;
Installation
of
vibration
wave
barriers.
Wave
barriers
would
consist
of
control
trenches
or
sheet
piles,
which
are
analogous
to
controlling
noise
with
sound
barrier.
The
applicability
of
this
technique
depends
on
the
characteristics
of
the
vibration
waves.
Applicant(s)
for
development
of
residential
structures
intended
for
human
occupancy
within
200
feet
of
the
Caltrain
mainline
track
shall
provide
a
vibration
design
study
prepared
by
a
qualified
acoustical
professional
verifying
that
the
performance
standards
set
forth
in
Mitigation
Measure
4.J-2a
will
be
achieved.
City
of
Brisbane
Building
Official
Prior
to
issuing
any
building
permit(s)
for
residential
structures
intended
for
human
occupancy
within
200
feet
of
the
Caltrain
mainline
track,
the
City
Building
Official
shall
review
the
vibration
design
study
prepared
for
the
applicant
by
a
qualified
acoustical
professional
to
ensure
that
the
performance
standards
set
forth
in
Mitigation
Measure
4.J-2a
will
be
achieved.
The
City
Building
Official
shall
also
be
responsible
for
monitoring
site
construction
to
ensure
that
the
development
features
proposed
by
the
applicant
to
meet
applicable
performance
standards
are
constructed
as
approved.
Issuance
of
building
permit(s)
for
residential
structures
intended
for
human
occupancy
within
200
feet
of
the
Caltrain
mainline
track
in
compliance
with
Mitigation
Measure
4.J-
2a.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Brisbane
Baylands
Final
EIR
4-67
May
2015