4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Hazards
and
Hazardous
Materials
(cont.)
Grade
K-12
school
facilities
shall
also
comply
with
California
Education
Code
Sections
17210
through
17224
and
related
statutory
provisions
related
to
risk
to
human
health
or
the
environment
at
proposed
school
properties
as
overseen
by
the
Department
of
Toxic
Substances
Control
(DTSC).
In
accordance
with
California
Education
Code
Sections
17210
through
17224
and
related
statutory
provisions,
the
school
district
must
prepare
a
Phase
I
Environmental
Site
Assessment
and/or
a
Preliminary
Endangerment
Assessment
(PEA)
to
identify
potential
contamination
and
evaluate
whether
it
presents
a
risk
to
human
health
or
the
environment
at
proposed
school
properties
as
overseen
by
the
Department
of
Toxic
Substances
Control
(DTSC).
The
environmental
investigation
and
any
required
remediation
of
properties
to
be
developed
for
use
as
schools
shall
be
overseen
by
DTSC
in
coordination
with
the
California
Department
of
Education
and
the
School
Facilities
Planning
Division.
Final
design
plans
shall
be
approved
by
the
School
Facilities
Planning
Division
of
the
California
Department
of
Education
prior
to
commencement
of
construction.
All
required
remediation
within
0.25
miles
of
a
proposed
K-12
school
site
within
the
Project
Site
shall
be
completed
prior
to
occupancy
of
the
school.
Surface
Water
Hydrology
and
Water
Quality
Compliance
with
water
quality
standards
during
construction
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.H-1a:
Prior
to
issuance
of
a
grading
permit,
an
Grading
permit
applicants
applicant
for
any
site
specific
development
project
to
be
constructed
within
the
Project
Site
shall
(1)
file
a
Notice
of
Intent
to
the
RWQCB
to
comply
with
the
statewide
General
Permit
for
Discharges
of
Storm
Water
Associated
with
Construction
Activities
and
shall
prepare
and
implement
a
site-specific
SWPPP
for
construction
activities
on
the
Project
Site
in
accordance
with
the
NPDES
General
Construction
Permit
and
(2)
demonstrate
compliance
with
the
City
of
Brisbane’s
Municipal
Regional
Stormwater
Permit
Order
No.
2011-0083
Provision
C.3.
The
site-specific
SWPPP
shall
include
all
provisions
of
the
Erosion
and
Sediment
Control
Plan
submitted
as
part
of
grading
City
of
Brisbane
City
Engineer
The
City
Engineer
shall
not
Approval
of
grading
permits
approve
any
grading
in
compliance
with
permit
without
verification
Mitigation
Measure
4.H-1a
from
the
applicant
that:
(1)
The
applicant
has
filed
a
Notice
of
Intent
with
the
RWQCB
to
comply
with
the
statewide
General
Permit
for
Discharges
of
Storm
Water
Associated
with
Construction
Activities;
Brisbane
Baylands
Final
EIR
4-57
May
2015
Previous Next