3.
Revisions
to
the
Text
of
the
Draft
EIR
Page
6-21
REVISE
the
text
at
the
bottom
of
page
6-21
as
follows:
Contributions
of
DSP,
DSP-V,
CPP,
and
CPP-V
Scenarios
to
Cumulative
Impacts
Sensitive
upland
habitat
and
special
status
plant
and
butterfly
species
occur
within
the
Project
Site
only
on
Icehouse
Hill,
which
is
being
preserved
in
open
space.
In
addition,
specific
mitigation
is
proposed
for
bird
strike
impacts
to
increase
nighttime
visibility
of
buildings.
Thus,
Project
Site
development
would
not
make
a
cumulative
considerable
contribution
to
the
significant
cumulative
impact
described
above
in
relation
to
habitats
within
the
vicinity
of
the
Baylands.
Because
adverse
impacts
on
meadow
and
alluvial
features
in
the
reach
of
the
Tuolumne
River
between
Hetch
Hetchy
Reservoir
(O’Shaughnessy
Dam)
and
Don
Pedro
Reservoir,
particularly
within
the
Poopenaut
Valley,
would
result
from
diversions
as
small
as
2
mgd,
the
amount
of
the
diversion
in
the
proposed
water
supply
agreement,
a
significant
impact
was
determined
to
result
from
the
proposed
water
supply
agreement.
Conclusion:
Because
Project
Site
development
would
not
result
in
loss
of
sensitive
upland
habitat
areas
or
impact
special
status
species,
it
would
not
make
a
cumulatively
considerable
contribution
to
the
significant
cumulative
impact
described
above.
However,
a
significant
impact
was
determined
to
result
from
the
proposed
water
supply
agreement.
The
proposed
water
supply
agreement
would
make
a
cumulatively
considerable
contribution
to
the
significant
cumulative
impact
described
for
the
reach
of
the
Tuolumne
River
between
Hetch
Hetchy
Reservoir
(O’Shaughnessy
Dam)
and
Don
Pedro
Reservoir.
However,
implementation
of
the
mitigation
measures
aimed
at
providing
pulse
flows
through
the
Poopenaut
Valley
by
the
SFPUC
(WSIP
EIR)
and
by
the
City
of
Brisbane
(Baylands
EIR)
would
reduce
cumulative
impacts
of
the
proposed
water
supply
agreement
on
biological
resources
within
the
Poopenaut
Valley
to
less
than
significant.
Page
6-41
[See
page
for
the
original
comment]
REVISE
the
final
paragraph
as
follows:
Cumulative
development
would
increase
residential
population
and
generate
new
employment,
which
would
increase
the
demand
on
library
services.
However,
public
library
facilities
in
San
Francisco
are
in
a
system
separate
from
that
of
San
Mateo
County,
and
are
intended
to
serve
the
needs
of
San
Francisco
residents.
Development
of
the
Baylands
with
residential
uses
as
proposed
in
the
DSP
and
DSP-V
scenarios
would
cause
a
significant
impact
on
existing
Brisbane
and
San
Mateo
County
library
facilities;
therefore,
Mitigation
Measure
4.L-4
requires
a
new
library
to
be
Brisbane
Baylands
Final
EIR
3-215
May
2015