3.
Revisions
to
the
Text
of
the
Draft
EIR
within
a
five-mile
radius
of
the
Project
Site
(in
relation
to
migratory
species).
Projects
within
the
geographic
scope
of
analysis
include
a
variety
of
proposed
urban
land
uses
as
listed
in
Table
6-2,
above,
and
include
Cumulative
Projects
and
18-22.
The
geographic
context
for
analysis
of
cumulative
impacts
on
biological
resources
also
encompasses
the
reach
of
the
Tuolumne
River
between
the
Hetch
Hetchy
Reservoir
(O’Shaughnessy
Dam)
and
Don
Pedro
Reservoir,
with
particular
emphasis
on
the
meadow
and
alluvial
features
in
this
reach,
including
the
Poopenaut
Valley.
Page
6-21
ADD
the
following
text
page
6-21,
immediately
before
the
section
entitled
“Contributions
of
DSP,
DSP-V,
CPP,
and
CPP-V
Scenarios
to
Cumulative
Impacts.”
Cumulative
Impacts
along
the
Tuolumne
River
As
discussed
in
Section
4.O,
as
part
of
the
proposed
water
transfer
from
OID,
the
SFPUC
would
hold
2,400
AFY
in
Hetch
Hetchy
Reservoir
instead
of
releasing
it
down
the
Tuolumne
River
for
capture
by
MID/Turlock
Irrigation
District
(TID)
in
New
Don
Pedro
Reservoir
and
redirecting
that
2,400
AFY
to
Brisbane
through
its
regional
water
system.
The
SFPUC
evaluated
the
effects
of
increasing
diversions
from
the
Tuolumne
River
and,
in
turn,
reducing
flow
releases
from
Hetch
Hetchy
Reservoir
on
the
Tuolumne
River
and
its
resources
in
the
program
EIR
it
prepared
on
its
Water
System
Improvement
Program
(WSIP)
(San
Francisco
Planning
Department,
2008).
This
program
EIR
is
incorporated
by
reference
and
is
available
for
review
on
the
San
Francisco
Planning
Department
website
(http://www.sf-planning.org/index.aspx?page=1829)
and
also
at
the
City
of
Brisbane
Planning
Department
during
regular
business
hours.
The
WSIP
Program
EIR
evaluated
the
impacts
of
a
range
of
possible
additional
diversions
from
the
Tuolumne
River
from
2
mgd
to
24
mgd.
As
described
and
analyzed
in
the
WSIP
Program
EIR
(Volume
7a,
page
13-8,
Table
13.2,
and
Volume
8,
Appendix
the
adopted
WSIP
would
result
in
an
increase
in
average
annual
diversions
of
2
mgd
from
the
Tuolumne
River
over
existing
conditions
in
the
area
along
the
Tuolumne
River
between
Hetch
Hetchy
and
Don
Pedro
Reservoirs.
The
WSIP
Program
EIR
described
and
analyzed
impacts
on
the
following
potentially
affected
resources
(see
Program
EIR
Volume
3,
Section
5.3,
and
Volume
7a,
Sections
14.5,
14.6,
and
14.7):
stream
flow
and
reservoir
water
levels,
geomorphology,
surface
water
quality,
surface
water
supplies,
groundwater,
fisheries,
terrestrial
biological
resources,
recreational
and
visual
resources,
and
energy
resources.
With
one
exception,
the
WSIP
Program
EIR
determined
that
impacts
of
the
adopted
WSIP—including
the
Brisbane
Baylands
Final
EIR
3-213
May
2015