3.
Revisions
to
the
Text
of
the
Draft
EIR
TABLE
5.8
(Continued)
COMPARISON
OF
IMPACTS
FOR
PROJECT
SITE
SCENARIOS
AND
ALTERNATIVES
Proposed
Project
Site
Development
Scenario
Impacts
DSP
SM
DSP-V
SM
CPP
SM
CPP-V
SM
No
Project–General
No
Project–No
Build
Plan
Buildout
Alternatives
Renewable
Energy
Generation
Reduced
Intensity
Non-Residential
Reduced
Intensity
Mixed
Use
Stormwater
Drainage
Facilities
Construction
of
new
stormwater
drainage
facilities
would
contribute
to
significant
impacts
of
Project
Site
development
in
relation
to
hazardous
materials,
hydrology
and
water
quality,
geology
and
soils,
vegetation
and
wildlife,
air
quality,
traffic,
and
noise,
as
discussed
in
sections
throughout
the
Draft
EIR.
Proposed
mitigation
would
reduce
impacts
to
less
than
significant
levels
for
all
scenarios.
Impact
4.O-4:
Would
the
Project
generate
wastewater
that
would
exceed
wastewater
treatment
requirements
of
the
San
Francisco
Regional
Water
Quality
Control
Board
(SFRWQCB)?
Impact
4.O-5:
Would
the
Project
be
served
by
a
landfill
with
sufficient
permitted
capacity
to
accommodate
the
project’s
solid
waste
disposal
needs
during
construction?
Total
Construction
Solid
Waste
Generation
(tons)
(Before
mitigation)
Impacts:
SU
–
Significant
Unavoidable
Impact
No
Impact
Brisbane
Baylands
Final
EIR
LTS
LTS
LTS
LTS
Impact:
N/A
Because
no
development
would
occur,
no
impacts
would
result.
Impact:
LTS
Similar
impacts
as
identified
for
the
scenarios
related
to
the
construction
and
operation
of
new
infrastructure
would
occur,
but
on
a
lesser
scale
due
to
the
smaller
size
of
the
recycled
water
facility.
Impact:
LTS
This
alternative
would
substantially
reduce
the
amount
of
development
(approximately
2.0
million
s.f.)
generating
solid
waste
during
construction
compared
to
the
scenarios.
Impact:
LTS
Similar
impacts
as
identified
for
the
scenarios
related
to
the
construction
and
operation
of
new
infrastructure
would
occur,
but
on
a
lesser
scale
due
to
the
smaller
size
of
the
recycled
water
facility.
Impact:
LTS
This
alternative
would
substantially
reduce
the
amount
of
development
(approximately
1.9
million
s.f.,
as
well
as
renewable
energy
facilities)
generating
solid
waste
during
construction
compared
to
the
scenarios.
Impact:
LTS
Similar
impacts
as
identified
for
the
scenarios
related
to
the
construction
and
operation
of
new
infrastructure
would
occur,
but
on
a
lesser
scale
due
to
the
smaller
size
of
the
recycle
water
facility.
Impact:
LTS
This
alternative
would
reduce
the
amount
of
development
(approximately
5.8
million
s.f.)
generating
solid
waste
during
construction
compared
to
the
scenarios.
Impact:
LTS
Similar
impacts
as
identified
for
the
scenarios
related
to
the
construction
and
operation
of
new
infrastructure
would
occur,
but
on
a
lesser
scale
due
to
the
smaller
size
of
the
recycle
water
facility.
Impact:
LTS
This
alternative
reduce
amount
of
development
(approximately
6.3
million
s.f.)
generating
solid
waste
during
construction
compared
to
the
scenarios.
Construction
and
operation
of
an
onsite
recycled
water
plant
would
require
detailed
engineering
design,
development,
and
approval
of
wastewater
treatment
requirements
by
the
SFRWQCB,
and
further
project-level
environmental
evaluation.
Through
compliance
with
SFPUC’s
SEP
pre-
treatment
requirements
and
discharge
limitations,
California
Code
of
Regulations
Title
22
standards,
and
USEPA
and
SFRWQCB
permits,
impacts
would
be
less
than
significant.
LTS
LTS
LTS
LTS
Considering
that
solid
waste
from
construction
within
the
Project
Site
represents
a
small
proportion
of
remaining
landfill
capacity,
the
fact
that
solid
waste
would
be
generated
and
disposed
of
over
a
period
of
30
years,
and
the
fact
that
one
landfill
has
enough
remaining
capacity
until
2077,
there
is
adequate
existing
landfill
capacity
to
accept
all
Project
Site
construction
waste.
26,381
26,539
16,505
16,659
Impact:
LTS
No
new
construction
would
be
proposed.
SM
–
Significant,
but
Mitigable
Impact
N/A
–
Not
Applicable
LTS
–
Less
than
Significant
Impact
3-207