TABLE
5.8
(Continued)
COMPARISON
OF
IMPACTS
FOR
PROJECT
SITE
SCENARIOS
AND
ALTERNATIVES
Proposed
Project
Site
Development
Scenario
Impacts
DSP
SM
DSP-V
SM
CPP
CPP-V
No
Project–General
No
Project–No
Build
Plan
Buildout
No
Impact
Because
no
residential
development
would
occur,
no
impacts
would
result.
Alternatives
Renewable
Energy
Generation
No
Impact
Because
no
residential
development
would
occur,
no
impacts
would
result.
Reduced
Intensity
Non-Residential
No
Impact
Because
no
residential
development
would
occur,
no
impacts
would
result.
Reduced
Intensity
Mixed
Use
Impact:
SM
Because
this
alternative
is
based
on
the
land
use
plan
of
the
DSP
scenario
but
with
reduced
density,
it
proposes
residential
uses
that
could
be
developed
in
areas
prone
to
flooding.
Similar
mitigation
as
that
proposed
for
the
DSP
scenario
would
be
provided.
Impact:
SM
This
alternative
would
allow
for
development
in
areas
between
Bayshore
Boulevard
and
the
Caltrain
tracks
that
could
become
flooded
during
a
100-year
storm
event
under
existing
conditions.
Similar
mitigation
as
that
proposed
for
the
scenarios
would
be
required
to
improve
the
existing
drainage
system
and
reduce
flooding
impacts.
No
Impact
No
Impact
No
Impact
Because
no
residential
development
would
occur,
no
impacts
would
result.
Impact
4.H-6:
Would
the
Project
place
housing
within
a
100-year
flood
hazard
area
as
mapped
on
a
federal
Flood
Hazard
Boundary
or
Flood
Insurance
Rate
Map
or
other
flood
hazard
delineation
map?
The
CPP
and
CPP-V
scenarios
do
not
propose
residential
use.
SM
SM
SM
SM
The
DSP
and
DSP-V
scenarios
propose
housing
in
areas
that
have
been
mapped
as
100-year
flood
hazard
areas
based
on
existing
topography.
These
areas
are
prone
to
flooding
primarily
due
to
insufficient
capacities
in
the
existing
drainage
system.
Proposed
mitigation
requires
drainage
and
conveyance
improvements
would
remove
flooding
hazards
placing
proposed
residential
development
outside
of
the
post-development
100-year
flood
hazard
area.
Impact:
N/A
Because
existing
conditions
would
remain,
no
development
would
occur
that
would
place
structures
within
a
100-year
flood
hazard
area
of
that
would
impede
or
redirect
flood
flows.
Any
improvements
or
structures
currently
in
flood
impacted
areas
would
remain
in
place.
Impact:
SM
This
alternative
would
allow
for
development
in
areas
between
Bayshore
Boulevard
and
the
Caltrain
tracks
that
could
become
flooded
during
a
100-year
storm
event
under
existing
conditions.
Similar
mitigation
as
that
proposed
for
the
scenarios
would
be
required
to
improve
the
existing
drainage
system
and
reduce
flooding
impacts.
Impact:
SM
This
alternative
would
allow
for
development
in
areas
between
Bayshore
Boulevard
and
the
Caltrain
tracks
that
could
become
flooded
during
a
100-year
storm
event
under
existing
conditions.
Similar
mitigation
as
that
proposed
for
the
scenarios
would
be
required
to
improve
the
existing
drainage
system
and
reduce
flooding
impacts.
Impact:
SM
This
alternative
would
allow
for
development
in
areas
between
Bayshore
Boulevard
and
the
Caltrain
tracks
that
could
become
flooded
during
a
100-year
storm
event
under
existing
conditions.
Similar
mitigation
as
that
proposed
for
the
scenarios
would
be
required
to
improve
the
existing
drainage
system
and
reduce
flooding
impacts.
Development
under
all
scenarios
would
allow
development
of
structures
in
areas
between
Bayshore
Boulevard
and
the
Caltrain
tracks
that
could
become
flooded
during
a
100-year
storm
Impact
4.H-7:
Would
event.
Proposed
mitigation
requires
improvements
to
the
existing
drainage
system
to
the
Project
place
reduce
impacts
to
less
than
significant
levels.
structures
within
a
100-year
flood
hazard
area
that
would
impede
or
redirect
flood
flows?
Impacts:
SU
–
Significant
Unavoidable
Impact
No
Impact
Brisbane
Baylands
Final
EIR
SM
–
Significant,
but
Mitigable
Impact
N/A
–
Not
Applicable
LTS
–
Less
than
Significant
Impact
3-180