3.
Revisions
to
the
Text
of
the
Draft
EIR
TABLE
5.8
(Continued)
COMPARISON
OF
IMPACTS
FOR
PROJECT
SITE
SCENARIOS
AND
ALTERNATIVES
Proposed
Project
Site
Development
Scenario
Impacts
DSP
SM
DSP-V
SM
CPP
SM
CPP-V
SM
No
Project–General
No
Project–No
Build
Plan
Buildout
Impact:
N/A
Impact:
SM
Site
grading
and
remediation
for
all
scenarios
and
alternatives
involving
building
construction
would
alter
drainage
patterns
and
result
in
a
similar
overall
potential
for
overall
impacts.
All
scenario
and
alternatives
involving
building
construction
would
have
similar
mitigation
requirements
imposed,
resulting
in
similar
less
than
significant
erosion
impacts
that
would
differ
only
based
on
the
length
of
time
the
site
was
subject
to
erosion
hazards
(see
Impact
4.E-5).
Alternatives
Renewable
Energy
Generation
Impact:
SM
Site
grading
and
remediation
for
all
scenarios
and
alternatives
involving
building
construction
would
alter
drainage
patterns
and
result
in
a
similar
overall
potential
for
overall
impacts.
All
scenario
and
alternatives
involving
building
construction
would
have
similar
mitigation
requirements
imposed,
resulting
in
similar
less
than
significant
erosion
impacts
that
would
differ
only
based
on
the
length
of
time
the
site
was
subject
to
erosion
hazards
(see
Impact
4.E-5).
Reduced
Intensity
Non-Residential
Impact:
SM
Site
grading
and
remediation
for
all
scenarios
and
alternatives
involving
building
construction
would
alter
drainage
patterns
and
result
in
a
similar
overall
potential
for
overall
impacts.
All
scenario
and
alternatives
involving
building
construction
would
have
similar
mitigation
requirements
imposed,
resulting
in
similar
less
than
significant
erosion
impacts
that
would
differ
only
based
on
the
length
of
time
the
site
was
subject
to
erosion
hazards
(see
Impact
4.E-5).
Reduced
Intensity
Mixed
Use
Impact:
SM
Site
grading
and
remediation
for
all
scenarios
and
alternatives
involving
building
construction
would
alter
drainage
patterns
and
result
in
a
similar
overall
potential
for
overall
impacts.
All
scenario
and
alternatives
involving
building
construction
would
have
similar
mitigation
requirements
imposed,
resulting
in
similar
less
than
significant
erosion
impacts
that
would
differ
only
based
on
the
length
of
time
the
site
was
subject
to
erosion
hazards
(see
Impact
4.E-5).
The
DSP
and
DSP-V
scenarios
retain
the
existing
Existing
site
drainage
drainage
pattern
of
the
Bayshore
and
Brisbane
patterns
would
remain
Lagoon
drainage
areas,
but
alter
the
Beatty
in
place.
Avenue
drainage
area
by
redirecting
runoff
from
approximately
47
acres
away
from
Beatty
Avenue
to
a
proposed
storm
drain
discharging
to
the
Central
Drainage
Channel.
The
CPP
and
CPP-V
scenarios
propose
similar
changes
to
existing
drainage
patterns,
but
preserve
a
larger
amount
Impact
4.H-3:
Would
of
open
space,
reducing
the
amount
of
the
Project
impervious
surface
area.
Project
Site
substantially
alter
the
development
would
not
alter
the
actual
existing
existing
drainage
course
(location)
of
Visitacion
Creek
east
of
the
pattern
of
the
site
or
railroad
right
of
way,
but
would
daylight
the
area,
including
currently
subsurface
portion
of
the
creek
from
the
through
the
alteration
railroad
right
of
way
east
and
extending
to
the
of
the
course
of
a
Roundhouse.
stream
or
river,
in
a
manner
which
would
Development
under
each
scenario
would
collect
result
in
substantial
and
convey
onsite
runoff
through
a
modified
erosion
or
siltation
storm
drainage
system
constructed
in
accordance
on-
or
off-site?
with
the
City’s
requirements
and
regional
MS4
NPDES
permit
requirements
to
accommodate
the
increase
in
runoff
and
changes
to
existing
drainage
patterns.
Proposed
biological
and
water
quality
mitigation
would
require
implementation
of
water
pollution
and
erosion
and
sediment
control
measures
consistent
with
SWPPP,
NPDES,
and
MS4
Permit
requirements
to
reduce
impacts
to
less-
than-significant
levels.
Impacts:
SU
–
Significant
Unavoidable
Impact
No
Impact
Brisbane
Baylands
Final
EIR
SM
–
Significant,
but
Mitigable
Impact
N/A
–
Not
Applicable
LTS
–
Less
than
Significant
Impact
3-177
May
2015
Previous Next