3.
Revisions
to
the
Text
of
the
Draft
EIR
TABLE
5.8
(Continued)
COMPARISON
OF
IMPACTS
FOR
PROJECT
SITE
SCENARIOS
AND
ALTERNATIVES
Proposed
Project
Site
Development
Scenario
Impacts
DSP
Daytime
Glare
SM
SM
SM
SM
Project
Site
development
would
create
substantial
new
glare-producing
building
surfaces.
The
DSP
and
DSP-V
scenarios
propose
more
building
area
(and
therefore
the
potential
for
more
reflective
surfaces)
than
the
CPP
and
CPP-V
scenarios.
The
DSP
and
DSP-
V
scenarios
would
therefore
have
a
greater
impact
than
the
CPP
or
CPP-V
scenarios.
Mitigation
measures
have
been
proposed
to
minimize
the
amount
of
glare-producing
surfaces
on
buildings,
resulting
in
less-
than-significant
glare
impacts
for
all
scenarios.
AIR
QUALITY
SM
SM
SM
SM
Impact:
N/A
No
development
is
proposed;
therefore
no
fugitive
dust
during
construction
would
be
generated.
However,
ongoing
site
operations
would
still
have
the
potential
to
generate
dust
Impact:
SM
Because
the
Bayshore
Industrial
Park
would
remain
in
place,
the
amount
of
grading
and
dust
generation
during
construction
would
be
somewhat
reduced;
however,
site
remediation
of
the
balance
of
the
Baylands
would
still
occur,
requiring
implementation
of
BAAQMD
BMPs
for
fugitive
dust
control.
Impact:
SM
A
similar
area
would
be
subject
to
remediation
as
the
scenarios,
with
similar
resulting
dust
generation.
Fugitive
dust
during
remediation
and
grading
would
require
implementation
of
BAAQMD
BMPs
for
fugitive
dust
control.
Impact:
SM
A
similar
area
would
be
subject
to
remediation
and
grading
as
the
scenarios,
with
similar
resulting
fugitive
dust
generation.
BAAQMD
BMPs
would
be
required
to
be
implemented
for
fugitive
dust
control.
Impact:
SM
A
similar
area
would
be
subject
to
remediation
and
grading
as
the
scenarios,
with
similar
resulting
fugitive
dust
generation.
BAAQMD
BMPs
would
be
required
to
be
implemented
for
fugitive
dust
control.
Project
Site
development
would
result
in
substantial
localized
dust
generation
during
the
anticipated
20-year
construction
period.
Because
the
area
subject
to
site
remediation
Impact
4.B-1
:
Would
and
grading
would
be
similar
for
each
scenario,
the
Project
result
in
air
quality
impacts
from
remediation
activities
would
be
similar
for
each
scenario.
Mitigation
localized
measures
require
adherence
to
BAAQMD
BMPs
construction
dust-
for
fugitive
dust
control,
resulting
in
less-than-
related
air
quality
significant
impacts.
impacts?
DSP-V
CPP
CPP-V
No
Project–General
No
Project–No
Build
Plan
Buildout
Impact:
N/A
No
new
sources
of
daytime
glare
would
result.
Impact:
SM
Because
this
alternative
proposes
only
2.0
million
s.f.
of
building
area,
impacts
would
largely
be
avoided,
but
would
still
require
mitigation.
Alternatives
Renewable
Energy
Generation
Impact:
SM
Because
this
alternative
has
the
least
amount
of
glare-
producing
surfaces
on
buildings,
impacts
from
buildings
would
be
reduced
but
still
require
mitigation.
Glare
from
renewable
energy
production
would
need
to
be
mitigated
Reduced
Intensity
Non-Residential
Impact:
SM
This
alternative
reduces
the
amount
of
glare-producing
surfaces
on
buildings
compared
to
the
scenarios
(to
5.3
million
s.f.
of
building
area),
but
would
still
require
mitigation.
Reduced
Intensity
Mixed
Use
Impact:
SM
This
alternative
reduces
the
amount
of
glare-producing
surfaces
on
buildings
compared
to
the
scenarios
(to
approximately
6.8
million
s.f.
of
building
area),
but
would
still
require
mitigation.
Impacts:
SU
–
Significant
Unavoidable
Impact
No
Impact
Brisbane
Baylands
Final
EIR
SM
–
Significant,
but
Mitigable
Impact
N/A
–
Not
Applicable
LTS
–
Less
than
Significant
Impact
3-147