3.
Revisions
to
the
Text
of
the
Draft
EIR
Appendix
H
of
this
EIR
contains
a
complete
list
of
the
databases
searched,
information
describing
the
governmental
agencies
and
their
databases,
and
a
map
showing
all
of
the
sites.
Figure
4.G-7
4.G-2
shows
the
location
of
these
sites.
Page
4.G-89
BBCAG-231
[See
page
5-137
for
the
original
comment]
REVISE
the
first
sentence
to
read
as
follows:
Project
Site
development
is
not
anticipated
to
include
the
type
of
large-
scale
manufacturing
or
processing
facilities
that
would
use,
store
or
transport
use
large
quantities
of
hazardous
materials
that
would
present
a
substantial
risk
to
people.
Page
4.G-90
BBCAG-233
[See
page
5-137
for
the
original
comment]
REVISE
the
third
paragraph
to
read
as
follows.
Former
landfill
operations
resulted
in
the
disposal
of
12.5
million
cubic
yards
of
non-hazardous
domestic,
industrial,
and
shipyard
waste
at
the
Brisbane
Landfill
from
between
1930
to
and
1967
from
residential,
commercial,
industrial
activities
including
shipyard
waste,
as
well
as
construction
rubble,
tires,
and
sewage.
The
thickness
of
the
current
soil
cover
ranges
from
a
few
feet
to
over
30
feet
in
some
locations
and
soil
movement
or
grading
could
take
place
in
areas
where
the
soil
cover
remains
shallow.
OU-1
still
overlies
a
plume
of
VOC-impacted
groundwater.
Contaminants
at
OU-2
are
widespread
over
the
former
railyard,
with
metals
impacts
in
soil
occurring
in
fill
materials
sitewide.
Bunker
C
fuel
impacts
in
soil
and
groundwater
are
limited
to
areas
where
fueling
operations
and
disposal
took
place.
Page
4.G-92
Master Response 1,
BBCAG-242
[See
page
5-139
for
the
original
comment]
REVISE
Mitigation
Measure
4.G-2a
as
follows:
Mitigation
Measure
4.G-2a
(Confirm
Achievement
of
Remediation
Goals):
Prior
to
approval
of
a
specific
plan
for
any
parcel
within
the
Project
Site,
the
project
applicant
shall
provide
confirmation
to
the
City
that
the
Department
of
Toxic
Substances
Control
(DTSC),
Regional
Water
Quality
Control
Board
(RWQCB),
and/or
the
San
Mateo
County
Environmental
Health
Division
as
the
Local
Enforcement
Agency,
as
applicable,
have
completed
their
reviewed
and
are
prepared
to
approve
a
accepted
the
Remedial
Action
Plan
or
final
closure
and
post-closure
maintenance
plans
upon
certification
of
appropriate
environmental
documentation
for
that
action.
Prior
to
issuance
of
a
building
or
grading
permit
(other
than
for
grading
needed
for
remediation
activities)
for
any
parcel
within
OU-1,
OU-2,
or
the
former
landfill
the
Project
Site,
the
applicant
shall
provide
the
City
with
evidence
that
the
Department
of
Toxic
Substances
Control
(DTSC),
Regional
Water
Quality
Control
Board
(RWQCB),
and/or
the
San
Mateo
Brisbane
Baylands
Final
EIR
3-87
May
2015
Previous Next