3.
Revisions
to
the
Text
of
the
Draft
EIR
generated
by
the
CPP
and
CPP-V
scenarios
is
predicted
to
be
81
and
72
percent
greater
than
the
number
generated
by
the
DSP
and
DSP-V
scenarios,
respectively.
The
methodology
used
to
determine
vehicle
trips
generated
by
each
scenario
is
described
starting
on
page
4.N-72
of
this
Draft
EIR.
The
larger
number
of
vehicle
trips
occurring
in
the
CPP
and
CPP-V
scenarios
results
from
the
physical
separation
between
onsite
employment
opportunities
and
offsite
housing
for
Project
Site
employees.
Page
4.F-21
OSEC-186
[See
page
5-330
for
the
original
comment]
DELETE
Mitigation
Measure
4.F-1
as
follows.
Mitigation
Measure
4.F-1:
All
new
development
within
the
Project
Site
shall
be
required
to
develop
and
implement
a
Greenhouse
Gases
Emissions
Reduction
Plan
(GHG
Plan)
containing
strategies
to
increase
energy
efficiency
and
reduce
GHG
emissions
to
the
greatest
extent
feasible
with
a
minimum
performance
standard
of
five
percent
(as
reflected
in
Table
4.F-3).
The
GHG
Plan
shall
be
submitted
to
the
City
for
approval
as
part
of
the
initial
application
process
for
building
permits
so
that
the
measures
will
be
verified
as
present
in
building
specifications.
The
GHG
Plan,
as
implemented,
shall
include
strategies
that
exceed
those
already
identified
in
the
project
description
or
required
by
law.
The
GHG
Plan
shall
include
strategies
designed
to
reduce
emissions
generated
by
motor
vehicles,
as
well
as
strategies
to
reduce
stationary
source
emissions
from
energy
consumption.
Strategies
shall
include,
but
not
be
limited
to,
the
following
types
of
GHG
reduction
measures:
Motor
Vehicle
Emissions
-
-
-
-
-
-
-
Provide
free
transit
passes
to
employees
and
onsite
residences;
Provide
secure
bike
parking
(at
least
one
space
per
20
vehicle
spaces);
Provide
showers
and
changing
facilities
for
employees;
Provide
information
on
transportation
alternatives
to
employees;
Establish
a
dedicated
employee
transportation
coordinator;
and
Include
preferential
carpool
and
vanpool
parking.
Provide
stand-alone
or
rooftop
solar,
wind,
or
other
renewable
energy
generation
facilities
(e.g.,
co-generation)
to
accommodate
at
least
3,600
MT
per
year
of
GHG
offset
within
the
Project
Site;
Upgrade
buildings
within
the
Project
Site
to
achieve
a
LEED
Gold
rating,
rather
than
the
LEED
Silver
rating
now
required
by
the
Brisbane
Municipal
Code;
Increase
solid
waste
diversion
from
landfills
by
10
percent
beyond
state
and
local
diversion
requirements;
Stationary
Source
Emissions
-
-
Brisbane
Baylands
Final
EIR
3-83
May
2015
Previous Next