2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
TABLE
6-1
SIGNIFICANT
UNAVOIDABLE
(SU)
IMPACTS
BY
PROJECT
DEVELOPMENT
SCENARIO
SU
Impacts
/
Significance
Criteria
Impact
4.F-1:
Would
the
Project
generate
greenhouse
gas
emissions,
either
directly
or
indirectly,
that
may
have
a
significant
impact
on
the
environment?
Impact
4.F-2:
Would
the
Project
conflict
with
an
applicable
plan,
policy,
or
regulation
of
an
agency
adopted
for
the
purpose
of
reducing
the
emissions
of
greenhouse
gases?
G.
Hazards
and
Hazardous
Materials
–
None
H.
Surface
Water
Hydrology
and
Water
Quality
–
None
I.
Land
Use
and
Planning
Policy
–
None
J.
Noise
and
Vibration
Impact
4.J-4:
Would
the
Project
result
in
a
substantial
temporary
or
periodic
increase
in
ambient
noise
levels
in
the
vicinity
of
the
project
above
levels
existing
without
the
Project?
K.
Population
and
Housing
Impact
4.K-1:
Would
the
Project
induce
substantial
population
growth
in
the
area
either
directly
or
indirectly?
L.
Public
Services
–
None
M.
Recreational
Resources
–
None
N.
Traffic
and
Circulation
Impact
4.N-1:
Would
the
Project
result
in
a
substantial
increase
in
traffic
under
Existing
plus
Project
conditions
at
intersections
in
the
vicinity
of
the
Project
Site?
Impact
4.N-2:
Would
implementation
of
the
Project
contribute
to
significant
existing
traffic
delays
at
freeway
mainline
segments?
Impact
4.N-3:
Would
the
Project
result
in
a
substantial
increase
in
traffic
under
Cumulative
With
Project
conditions
at
the
study
intersections?
Impact
4.N-4:
Would
the
Project’s
contribution
to
future
cumulative
traffic
impacts
at
freeway
mainline
segments
be
significant?
Impact
4.N-5:
Would
the
Project
(DSP-V
scenario)
result
in
a
substantial
increase
in
PM
peak
hour
traffic
at
study
intersections
and
freeway
mainline
segments
that
would
operate
unacceptably
due
to
weekday
evening
events
at
the
arena?
Impact
4.N-7:
Would
the
Project
cause
an
increase
in
transit
demand
that
could
not
be
accommodated
by
San
Francisco
Muni
or
SamTrans
transit
capacity?
Impact
4.N-8:
Would
the
Project
cause
an
increase
in
delays
or
operating
costs
resulting
in
substantial
adverse
effects
on
transit
service
levels
(i.e.,
additional
buses
or
trains
could
be
required
due
to
Project
transit
trips)?
O.
Utilities,
Service
Systems,
and
Water
Supply
Impact
4.O-3:
Would
the
Project
result
in
the
construction
of
new
water,
wastewater
treatment,
and/or
stormwater
drainage
facilities
or
expansion
of
existing
facilities,
the
construction
of
which
could
cause
significant
environmental
effects?
P.
Energy
Resources
–
None
SU
SU
SU
SU
SU
SU
SU
SU
SU
SU
SU
SU
SU
SU
-
-
DSP
-
DSP-V
-
CPP
SU
CPP-V
SU
-
-
SU
SU
SU
SU
SU
-
SU
SU
SU
SU
SU
SU
SU
-
SU
SU
SU
-
SU
SU
SU
SU
SU
SU
SU
SU
Brisbane
Baylands
Final
EIR
2.9.3-128
May
2015