2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
Table
4.I-1
concludes
that
all
four
concept
plan
scenarios
provide
for
these
connections
through
the
provision
of
new
roadways,
including
the
proposed
Geneva
Avenue
extension,
along
with
proposed
bicycle
and
pedestrian
trails,
as
well
as
the
potential
for
a
third
roadway
and
pedestrian
connection
between
the
Baylands
and
Central
Brisbane.
Because
of
the
location
of
the
Baylands
to
the
east
of
Central
Brisbane,
only
east-west
corridors
will
provide
connectivity
with
Central
Brisbane.
General
Plan
Policy
388
applies
only
to
the
Beatty
Subarea,
and
requires
that
any
specific
plan
for
the
Beatty
Subarea
“
include
program
s
for
odor
and
litter
reduction.”
Since
the
boundaries
of
the
Beatty
Subarea
are
coterminous
with
those
of
the
existing
Recology
site,
General
Plan
Policy
388
applies
only
to
the
Recology
facility.
The
discussion
of
consistency
with
General
Plan
Policy
388
is
revised
to
read
as
follows.
DSP/DSP-V
Policy
388:
The
Specific
Plan
shall
include
programs
for
odor
and
litter
reduction.
Consistent
Not
Applicable.
General
Plan
Policy
388
applies
only
to
the
Beatty
Subarea
(Recology
site),
which
is
not
a
part
of
the
DSP/DSP-V
scenarios
The
Specific
Plan
for
the
DSP
and
DSP-V
scenarios
contains
programs
to
minimize
solid
waste
generation.
CPP/CPP-V
Potentially
Consistent.
Implementation
of
this
policy
would
occur
through
a
specific
plan,
which
is
not
proposed
at
this
time
for
the
CPP
and
CPP-V
scenarios.
Discussion
of
odor
generation
within
the
Baylands
is
provided
in
the
Draft
EIR
starting
page
4.B-9
(existing
conditions)
and
page
4.B-45
(analysis
of
impacts).
The
Bayshore
Industrial
Park
consists
of
metal
buildings
with
roll-up
doors
that
will
be
demolished
and
replaced
with
new
uses
under
each
of
the
proposed
development
scenarios.
These
buildings
will
not
therefore
need
to
be
shored
up
or
stabilized
during
construction.
Noise
from
demolition
and
construction
would
be
generated
during
daytime
hours
and
may
result
in
elevated
exterior
noise
levels
during
the
noisiest
construction
phases
that
may
be
noticeable
to
surrounding
workers.
Since
uses
within
this
area
are
industrial
in
nature,
they
are
considered
noise-tolerant
for
purposes
of
CEQA
assessment,
and
would
not
be
impacted
during
Baylands
construction
prior
to
demolition
and
replacement
of
existing
uses.
It
is
unclear
what
the
comment
means
by
“heavy
tamping.”
Geotechnical
stabilization
techniques,
such
as
deep
dynamic
compaction
(i.e.,
repeatedly
dropping
a
large
weight
onto
the
soil)
and
vibro-
Brisbane
Baylands
Final
EIR
2.9.3-93
May
2015