2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
OSEC-182
[See page
5-329 for the original comment]
The
Final
EIR
includes
an
updated
estimation
of
Project
Site
development-related
GHG
emissions
based
on
the
latest
version
of
the
CalEEMod
model,
which
was
released
in
October
of
2013
subsequent
to
the
release
of
the
Baylands
Draft
EIR.
Table
4.F-2
is
revised
to
reflect
the
recalculations
and
add
the
missing
parenthesis
bracket,
as
shown
on
the
following
page.
TABLE
4.F-2
ESTIMATED
EMISSIONS
OF
GREENHOUSE
GASES
(YEAR
20402035)
FROM
OPERATION
OF
THE
CPP
AND
CPP-V
SCENARIOS
Emissions
(metric
tons
of
CO
2
e
per
year)
Source
Community
Proposed
Project
(CPP)
Construction
(Amortized
Annual
Emissions)
Motor
Vehicle
Trips
Electricity
Natural
Gas
Solid
Waste
Other
Sources
(i.e.,
area
sources,
water/wastewater)
Existing
land
uses
to
be
removed
(Industrial
Park)
Renewable
Energy
Generation
(PV)
Total
Unmitigated
Operational
GHG
Emissions
Operational
GHG
Emissions
per
Service
Population
(16,191
jobs
BAAQMD
Efficiency
Threshold
Significant
(Yes
or
No)?
1,6822,382
67,25241,927
11,50311,647
5,5619,415
26,7662,759
1,3362,254
-2,762-1,159
-3,116
108,22266,109
6.74.0
4.6
YesNo
Community
Proposed
Project
–
Recology
Expansion
Variant
(CPP-V)
Construction
(Amortized
Annual
Emissions)
Motor
Vehicle
Trips
(non-Recology)
Recology
Vehicle
Trips
Electricity
Natural
Gas
Solid
Waste
Other
Sources
(i.e.,
area
sources,
water/wastewater)
Existing
land
uses
to
be
removed
(Industrial
Park)
Recology
Renewable
Energy
Implementation
Renewable
Energy
Generation
(non-Recology
PV)
Total
Unmitigated
Operational
GHG
Emissions
Operational
GHG
Emissions
per
Service
Population
(16,073
jobs)
BAAQMD
Efficiency
Threshold
Significant
(Yes
or
No)?
1,6562,322
64,21339,786
748
10,83910,500
4,974
7,844
24,8242,625
1,3362,254
-2,762-1,159
-11,022-10,723
-3,116
91,69051,081
5.73.2
4.6
YesNo
NOTE:
GHG
emissions
from
vehicles
and
area
sources
(including
natural
gas
combustion)
associated
with
Project
Site
development
were
calculated
using
the
CalEEMod
model
URBEMIS2007
model
and
BGM
and
trip
generation
data
from
the
CPP
and
CPP-V
scenarios
traffic
analysis.
Additional
data
and
assumptions
are
included
in
Appendix
G
of
this
EIR.
Brisbane
Baylands
Final
EIR
2.9.3-63
May
2015