2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
volume,
peak
flows,
and/or
nonpoint
source
pollution
through
evapotranspiration,
infiltration,
detention,
and
filtration
or
biological
and
chemical
actions.
Stormwate
r
BMPs
are
often
classified
as
“structural”
(i.e.,
devices
installe
d
or
constructed
on
a
site)
or
“non
-
structural”
(procedures,
such
as
modified
landscaping
practices).
The
US
EPA
publishes
lists
of
stormwater
BMPs
for
use
by
local
governments,
builders,
and
property
owners.
Clean
fill
(Section
4.H)
is
a
common
term
used
in
the
construction
industry
to
denote
fill
soils
that
are
free
of
rubble
and
construction
debris.
NPDES
(page
4.H-11)
is
the
acronym
for
the
National
Pollutant
Discharge
Elimination
System,
which
is
described
in
detail
on
page
4.H-11.
Pest
(page
4.H-34)
as
used
in
Mitigation
Measure
4.H-5
on
page
4.H-34,
“pests”
refers
to
nuisance
animals,
such
as
mice,
rats,
and
mosquitos
that
threaten
the
public
health
by
spreading
diseases.
Centrally
located
facilities
(page
4.I-19)
is
a
term
used
in
Brisbane
General
Plan
Policy
27,
which
rea
ds
in
whole,
“Provide
centrally
located
public
facilities
for
public
services
and
community
events
so
as
to
maximize
use
by
Brisbane
residents
and
businesses.”
“Centrally
located
facilities”
is
not
defined
in
the
General
Plan
beyond
its
use
in
Policy
27.
The
evaluation
of
consistency
with
General
Plan
Policy
27
on
page
4.I-19
is
based
on
a
working
definition
that
centrally
located
public
facilities
consist
of
public
facilities
located
so
as
to
be
convenient
to
the
Brisbane
residents
and
businesses
they
serve.
Podium
parking
(page
4.N-69)
refers
to
a
semi-subterranean
or
above
ground
parking
structure
built
as
an
integral
part
of
a
multi-story
commercial,
mixed-use,
or
residential
building
that
forms
the
base
of
the
building.
Qualifying
phase
of
development
(page
4.N-146)
The
phrase
“qualifying
phase
of
development”
is
not
actually
used
in
the
Draft
EIR.
A
“qualifying
development
project,”
as
the
term
is
used
on
page
4.N
-146
refers
to
a
project
that
would
generate
100
or
more
net
new
trips
during
the
AM
or
PM
peak
hour,
and
would
thus
be
required
to
mitigate
the
impacts
of
net
increases
in
trips
pursuant
to
the
County’s
Congestion
Management
Program
(CMP).
Brisbane
Baylands
Final
EIR
2.9.3-5
May
2015
Previous Next