2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
expanded
water
storage
facilities
and
conveyance
infrastructure.
On
page
4.O-48,
the
Draft
EIR
states
that
in
the
“absence
of
information
regarding
location,
design,
and
method
of
water
storage
facility
construction,
it
must
be
assumed
that
constructing
a
new
storage
tank
on
a
hillside
could
result
in
significant
environmental
impacts
in
areas
such
as
visual
resources,
slope
stability,
erosion
and
water
quality,
and
possibly
biological
resources.
While
it
is
likely
that
impacts
of
siting
and
constructing
such
a
storage
facility
could
be
avoided
or
mitigated
to
less-than-significant
levels
through
a
combination
of
siting
options
and
mitigation
measures,
at
this
time
without
site-specific
information
these
impacts
are
considered
to
be
significant
unavoidable.”
CEQA
Guidelines,
Section
15168
(c)(1)
states
that
“If
a
later
activity
would
have
effects
that
were
not
examined
in
the
program
EIR,
a
new
Initial
Study
would
need
to
be
prepared”
along
with
appropriate
environmental
documentation
depending
on
the
results
of
the
Initial
Study.
Thus,
the
design
and
construction
of
needed
water
storage
facilities
would
be
treated
the
same
as
a
subsequent
site-specific
development
project
(see
Master Response
1
for
discussion
of
subsequent
site-
specific
projects).
Because
even
the
initial
increments
of
development
would
require
expansion
of
the
City’s
existing
water
storage
capacity,
construction
permits
for
new
development
within
the
Baylands
would
not
be
approved
by
the
City
until
a
location
for
needed
water
storage
facilities
was
identified,
the
facilities
were
designed,
environmental
review
of
the
impacts
of
their
construction
was
completed,
and
funding
agreements
were
in
place
for
the
facilities.
BCC-744
[See page
5-289 for the original comment]
Mitigation
Measure
4.B-8
requires
implementation
of
an
odor
management
plan
at
the
proposed
recycled
water
plant
with
sufficient
control
measures
to
meet
BAAQMD
odor
detection
thresholds.
The
text
on
page
4.O-58
that
is
cited
in
the
comment
addresses
solid
waste
management
during
construction
and
operation
of
proposed
Project
Site
development.
The
comment
more
likely
addresses
the
second
paragraph
on
page
4.O-49,
which
is
revised
to
read
as
follows:
Air
quality
impacts
of
the
onsite
recycled
water
plant
are
included
in
the
air
quality
impacts
evaluated
in
Section
4.B,
Air
Quality
.
While
the
recycled
water
plant
would
be
required
to
meet
Bay
Area
Air
Quality
District
(BAAQMD)
emissions
standards
and
therefore
be
considered
to
have
less-than-significant
air
quality
impacts,
the
plant
would
contribute
to
the
significant
unavoidable
air
quality
impacts
identified
in
that
section.
To
address
odor
impacts,
Mitigation
Measure
4.B-8
requires
implementation
of
an
odor
management
plan
at
the
proposed
recycled
water
plant
with
sufficient
control
measures
to
meet
BAAQMD
odor
detection
thresholds.
At
a
minimum,
the
following
requirements
would
be
included
in
the
design
of
the
recycled
water
plant:
Brisbane
Baylands
Final
EIR
2.9.2-204
May
2015
Previous Next