2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
up
to
150
events
per
year
could
occur
at
the
arena
(e.g.,
Wednesday,
Friday,
and
Saturday
every
week
per
year).
Assuming
an
approximate
weekday
evening
start
time
of
about
7:00
PM,
the
weekday
PM
peak
hour
(5:00
to
6:00
PM)
was
analyzed
for
pre-event
conditions
to
address
transportation
impacts
associated
with
possible
sold-out
events
occurring
at
the
arena.
Although
no
specific
program
has
been
developed
for
events
at
the
arena
Of
the
up
to
150
events
that
could
occur
at
the
arena,
it
is
unknown
how
many
sell-out
events
with
17,000
attendees
would
occuring
during
weekday
evenings
would
likely
be
infrequent.
Footnote
15
on
page
4.N-91
is
revised
to
read:
The
analysis
of
Existing
plus
Project
conditions
assumes
typical
traffic
conditions
(i.e.,
not
those
conditions
when
the
proposed
arena
under
the
DSP-V
scenario
would
have
a
weekday
evening
sell-out
event).
Traffic
impacts
resulting
from
an
infrequent
occurrence
of
a
weekday
evening
special
event
at
the
arena
are
described
separately
in
Impact
4.N-5.
The
paragraph
starting
at
the
bottom
of
page
4.N-126
and
ending
at
the
top
of
page
4.N-128
is
revised
to
read
as
follows:
The
impact
analysis
of
arena
events
under
Cumulative
(2030)
conditions
with
the
DSP-V
scenario
assumed
a
weekday
evening
sold-out
event
at
the
approximately
17,000-seat
arena.
22
Although
no
specific
program
has
been
developed
for
events
at
the
arena,
it
is
anticipated
that
up
to
150
events
could
occur
at
the
arena
annually.
It
is
no
known
how
many
sold-out
events
with
17,000
attendees
would
occurring
during
weekday
evenings
would
likely
be
infrequent.
Smaller-sized
events
during
weekday
evenings
and
events
occurring
during
the
day
and
on
weekends
would
have
fewer
impacts
due
to
the
lower
traffic
volumes
demands
on
the
study
area
roadways.
BCC-649
[See page
5-277 for the original comment]
The
Existing
Plus
Project
scenarios
do
not
include
trips
from
future
development
and
represent
current
conditions
with
the
Brisbane
Baylands
Project
Site
development
trips
added.
See
Table
4.N-31
in
the
Draft
EIR
for
LOS
analysis
under
Cumulative
Conditions,
which
includes
traffic
generated
by
nearby
development
and
overall
background
traffic
growth.
LOS
for
unsignalized
intersection
is
based
upon
the
delay
experienced
at
the
stop-
controlled
approaches.
In
this
case,
only
the
northbound
approach
is
stop
controlled,
and
the
added
volume
adds
little
delay,
as
the
conflicting
movement
volumes
are
low.
There
is
no
direct
access
between
Bayshore
Boulevard
and
the
Sierra
Point
Parkway
/
US
101
ramps.
Traffic
impacts
(which
are
inclusive
of
auto
and
transit
Brisbane
Baylands
Final
EIR
2.9.2-178
May
2015
Previous Next