2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
Mandatory
Baylands
Project
Site
TDM
measures
may
include
encouraging
large
employers
to
offer
relocation
assistance.
Relocation
assistance
is
just
one
tool
in
the
TDM
toolkit
of
reducing
the
overall
magnitude
of
trips,
shifting
trips
away
from
single
occupant
vehicles,
and
shortening
trip
lengths.
See
for
more
information
on
the
enforcement
of
TDM
programs.
The
proposed
roadway
network
for
the
DSP
and
DSP-V
scenarios
was
based
on
the
proposed
Brisbane
Baylands
Specific
Plan
prepared
by
the
applicant
for
those
scenarios.
The
roadway
network
for
the
CPP
and
CPP-V
scenarios
was
based
on
the
concept
plan
prepared
for
those
scenarios.
Roadway
widths
for
the
CPP
and
CPP-V
scenarios
were
assumed
to
be
same
as
for
similar
roadways
in
the
DSP
and
DSP-V
scenarios.
Roadways
were
assumed
to
have
the
following
configurations.
Travel
Lanes
Street
Parking
Bicycle
Facilities
Pedestrian
Facilities
Street
R.O.W
Transit
Bioswale
Arterial
Streets
Geneva
Avenue
Sierra
Point
Parkway
140’
87’
74’
64’
74’
56’
–
107’
56’
-
70’
64’
–
66’
40’
–
68’
6
4
2
2
2
2
2-4
2
2
22’
BRT
--
Bus
--
--
Bus/None
Bus
Bus/None
--
Yes
No
Yes
--
Yes
Yes
Yes
Yes
Yes
Class
I
Sidewalks
In
median
In
median
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Multi-use
Class
I
Class
I
Class
II
Class
II
Class
II
On
street
On
street
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Collector
Streets
Roundhouse
Circle
Tunnel
Avenue
Lagoon
Road
Office/Commercial
Residential
Multi-use
Class
I
Local
Streets
Office
/R&D
Residential
See
Response
The
TDM
section
on
“Streets
Designed
for
Alternative
Transportation
Modes,”
page
4.N-66
of
the
Draft
EIR,
is
general
in
its
description
of
alternatives.
Based
on
the
conceptual
transit
network,
the
southern
portion
of
the
site
would
be
further
from
transit
facilities
than
the
northern
portion
of
the
site,
as
documented
on
pages
4.N-59
to
4.N-60
of
the
Draft
EIR.
The
Draft
EIR
acknowledges
that
additional
transit-related
improvements
may
become
elements
of
a
TDM
program,
including
shuttle
service.
The
Draft
EIR
does
not
address
transit
routes
within
the
Baylands,
since
transit
agencies
have
not
defined
future
routes
within
the
Baylands,
and
are
not
likely
to
do
so
until
after
development
is
actually
approved.
The
need
for
enhancing
transit
facilities
within
the
southerly
portion
of
the
site
or
for
further
Brisbane
Baylands
Final
EIR
2.9.2-165
May
2015