2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
Lumber,
which
still
remain.
Much
of
the
former
landfill
is
used
for
soil
and
construction
material
recycling.
Champion
Speedway,
a
1/8
mile
oval
racetrack
operated
on
a
portion
of
the
landfill
from
approximately
1963
to
1979,
holding
a
number
of
events,
including
automobile
races
and
demolition
derbies.
After
closure,
the
speedway
was
demolished
and
covered
by
fill.
See
also
Master Response
7
for
discussion
of
changes
in
ground
elevations
occurring
due
to
ongoing
soils
processing
operations
within
the
former
landfill.
The
visual
impacts
associated
with
formal
closure
of
the
landfill
and
future
grading
are
captured
in
Section
4.A,
Aesthetics
and
Visual
Resources
,
in
Table
4.A-1,
which
provides
photosimulations
of
changes
in
ground
elevations
from
existing
conditions
in
the
2010
baseline
year
and
with-project
ground
elevations
for
each
concept
plan
scenario.
As
noted
in
Master Response
7,
the
2010
baseline
represents
a
worst-case
analysis
for
assessment
of
environmental
impacts
of
the
proposed
Baylands
site
development
as
required
by
CEQA.
A
description
of
active
interim
uses
within
the
Baylands
Project
Site
is
provided
on
page
3-18
of
the
Draft
EIR.
Landfill
monitoring
activities
are
discussed
in
Section
4.H,
Hazards
and
Hazardous
Materials
,
of
the
Draft
EIR.
BCC-386
[See page
5-241 for the original comment]
The
Draft
EIR
states
on
page
4.I-2
that
most
of
Icehouse
Hill
consists
of
undisturbed
natural
area
based
on
archival
research
and
biological
resources
reconnaissance
studies
conducted
for
the
Draft
EIR.
While
it
is
recognized
that
horse
grazing,
a
communications
facility,
and
use
as
a
shooting
range
have
resulted
in
degradation
of
habitat,
Icehouse
Hill
provides
habitat
for
special
status
butterfly
species.
While
the
comment
notes
that
past
activities
occurring
prior
to
2010
resulted
in
habitat
degradation
on
Icehouse
Hill,
such
degradation
did
not
occur
as
the
result
of
any
action
related
to
the
proposed
Baylands
development
that
is
the
subject
of
the
Brisbane
Baylands
EIR.
The
impacts
of
past
activities
on
Icehouse
Hill
are
not,
therefore,
impacts
of
the
proposed
Baylands
development
program.
As
part
of
the
City
planning
review
of
proposed
Baylands
development,
the
City
will
consider
programs
for
restoration
of
habitat
on
Icehouse
Hill.
Text
has
been
added
to
the
Draft
EIR
to
address
the
police
shooting
range
and
presence
of
lead
on
Icehouse
Hill.
See
text
revisions
to
Draft
EIR
page
4.G-98
in
Chapter
3.0
of
the
Final
EIR
for
discussion
of
the
former
shooting
range
and
potential
lead
contamination
on
Icehouse
Hill.
BCC-387
[See page
5-241 for the original comment]
See
Master Response 19,
Land
Use
Compatibility,
for
a
discussion
of
the
Kinder
Morgan
tank
farm
and
land
use
compatibility.
Brisbane
Baylands
Final
EIR
2.9.2-104
May
2015
Previous Next