2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
some
existing
flooding
issues.
The
drainage
improvements
required
in
the
Draft
EIR
include
LID
drainage
features,
which
could
include
detention
basins
or
cisterns
as
required
by
C.3
requirements
to
minimize
the
amount
of
offsite
flow.
The
requirements
are
designed
to
ensure
that
existing
water
resources
and
receiving
waters
of
offsite
stormwater
discharges
are
protected
from
degradation
of
water
quality.
See
Section
4.C,
Biological
Resources
,
for
a
full
analysis
of
biota
impacts
related
to
the
proposed
improvements.
BCC-380
[See page
5-239 for the original comment]
As
stated
in
the
Draft
EIR
on
page
4.H-21,
any
dewatering
activities
that
would
occur
as
part
of
construction
would
be
temporary
in
nature
and
conducted
in
accordance
with
RWQCB
requirements,
which
would
address
any
concerns
regarding
influences
on
existing
contaminated
groundwater.
In
addition,
considering
that
the
dewatering
would
only
be
temporary,
any
effects
would
also
be
temporary
and
would
cease
once
that
stage
of
construction
is
complete.
In
addition,
dewatering
activities
would
be
planned
in
accordance
with
the
recommendations
of
the
design
level
geotechnical
report
as
required
by
law
which
would
include
safeguards
to
ensure
that
secondary
effects
such
as
“slumping”
would
not
occur.
To
clarify
its
intent,
Mitigation
Measure
4.H-1b
is
revised
to
read
as
follows
Mitigation
Measure
4.H-1b:
Prior
to
issuance
of
a
grading
permit,
an
applicant
for
any
site
specific
development
project
to
be
constructed
within
the
Project
Site
shall
comply
with
any
site-specific
NPDES
permit
requirements
for
dewatering
activities,
as
administered
by
the
RWQCB.
The
RWQCB
could
require
compliance
with
certain
provisions
in
the
permit,
such
as
treatment
of
the
flows
prior
to
discharge,
depending
on
the
particular
site
conditions.
Discharge
of
the
groundwater
generated
during
dewatering
to
the
sanitary
sewer
or
storm
drain
system
shall
only
occur
with
authorization
of
and
required
permits
from
the
applicable
regulatory
agencies,
including
the
Bayshore
Sanitary
District
or
the
RWQCB.
Site
dewatering
activities
shall
also
be
monitored
by
a
state
licensed
geotechnical
engineer
in
such
a
manner
as
to
avoid
the
potential
for
damaging
buildings
or
infrastructure
due
to
potential
subsidence
of
the
ground
surface
in
accordance
with
any
requirements
from
the
City
Engineer.
BCC-381
[See page
5-239 for the original comment]
Mudflows
are
debris
flows
that
involve
large
volumes
of
water
mixed
with
soil,
and
are
typically
associated
with
heavy
rainfall
or
sudden
snow
melts.
While
an
existing
waterline
break
could
theoretically
occur,
it
would
be
speculative
to
assume
such
an
event
would
actually
occur
within
an
area
that
is
outside
of
the
Baylands
Project
Site.
The
relatively
flat
topography
of
the
area,
even
with
the
presence
of
Icehouse
Hill,
is
not
prone
to
substantive
debris
flows
or
mudflows
due
to
the
lack
of
any
substantive
nearby
upland
slopes.
Brisbane
Baylands
Final
EIR
2.9.2-101
May
2015
Previous Next