Measure
4.C-1g
requires
implementation
of
erosion
control
and
water
pollution
control
measures
consistent
with
SWPPP
requirements,
and
an
on-going
maintenance
plan,
to
ensure
“no
reduction
in
water
and
environmental
quality.”
To
provide
for
a
broader
application
of
Mitigation
Measure
4.C-1e,
its
first
paragraph
is
revised
to
read
as
follows:
Mitigation
Measure
4.C-1g:
Construction
and
operation
of
proposed
recreational
uses
and
open
space
areas
along
Visitation
Creek
or
adjacent
to
the
northern
lagoon
edge
shall
include
implementation
of
erosion
control
and
water
pollution
control
measures
consistent
with
Storm
Water
Pollution
Prevention
Program
(SWPPP)
requirements,
and
implementation
of
an
on-going
maintenance
plan
to
ensure
no
reduction
in
water
and
environmental
quality
as
a
result
of
recreational
uses
adjacent
to
within
the
Creek
and
lagoon.
BCC-120
[See page
5-187 for the original comment]
The
comment
states
that
it
is
also
problematic
that
a
SWPPP
is
a
“voluntary
compliance”
program,
and
that
monitoring
required
is
not
necessarily
testing
the
first
draw
of
stormwater
from
the
new
rainy
season,
but
that
testing
is
only
required
if
the
first
rains
happen
in
a
convenient
9-5
business
time.
As
a
result,
the
comment
notes
that
the
accuracy
of
tests
can
be
challenged
and
should
not
be
considered
a
true
reflection
of
run-off
conditions
at
the
Baylands.
Page
4.C-46
of
the
Draft
EIR
describes
the
construction
SWPPP
mandate,
which
is
not
voluntary.
The
Draft
EIR
also
includes
requirements
and
performance
standards
beyond
the
period
of
construction
such
as
on-going
maintenance,
including
identification
of
funding
for
long-term
monitoring,
maintenance
and
practical
applications
such
as
litter
collection
and
removal
that
would
be
required
to
be
established
prior
to
advancing
buildout
of
the
Baylands
and
that
would
result
in
water
quality
benefits
by
preventing
introduction
of
debris
into
adjacent
water
bodies.
To
clarify
how
water
quality
monitoring
is
to
be
conducted
as
part
of
the
SWPPP,
the
final
bullet
point
in
Mitigation
Measure
4.C-1g
is
revised
to
read
as
follows.
Identify
a
funding
mechanism
to
ensure
site
maintenance
and
implementation
of
environmental
quality
monitoring
at
the
creek
and
lagoon
as
part
of
the
open
space
interpretive
center.
Monitoring
parameters
may
shall
include
but
would
not
be
limited
to
water
quality
monitoring
that
at
a
minimum
tests
the
first
draw
of
stormwater
from
the
new
rainy
season,
and
may
include,
but
not
be
limited
to
vegetation
monitoring,
and
passive
observation
and
recording
of
fish
species
present.
BCC-121
[See page
5-187 for the original comment]
The
bullet
point
referred
to
in
this
comment
is
one
of
several
options
to
protect
water
quality
in
the
Brisbane
Lagoon.
Any
construction
of
diversion
dikes
or
drainage
swales
as
part
of
Baylands
development
would
be
required
to
comply
with
the
provisions
of
Brisbane
Baylands
Final
EIR
2.9.2-46
May
2015
Previous Next