2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
Waste
Discharge
Order
01-041
16
,
the
landfill
is
routinely
monitored
for
offsite
migration
of
contaminants
in
groundwater,
leachate
seeps,
and
soil
gas.
The
landfill
closure
process
is
overseen
Environmental
Health
Division
of
the
by
San
Mateo
County
Health
System
and
the
RWQCB.
As
stated
in
the
Draft
EIR,
cleanup
levels
approved
by
the
RWQCB
may
not
reflect
drinking
water
standards
because
the
groundwater
basin
is
not
used
for
domestic
water
supply
(drinking
water).
See
for
discussion
of
groundwater
cleanup
standards.
The
description
referenced
in
this
comment
is
to
the
entirety
of
the
watershed,
which
is
far
larger
than
the
former
wetland
marsh.
The
final
paragraph
on
page
4.H-1
is
revised
to
read
as
follows.
Historically,
the
Project
Site,
commonly
known
as
the
Brisbane
Baylands,
was
part
of
an
estuarine
ecosystem
through
which
upland
drainage
flowed
into
tidal
marshes
and
mudflats
before
reaching
deeper
waters
of
San
Francisco
Bay.
The
Project
Site
is
located
within
the
Visitacion-Guadalupe
Valley
Watershed,
which
topographically
appears
as
a
large
cove
or
generally
consists
of
a
bowl
straddling
the
San
Francisco/
and
San
Mateo
County
line
Counties.
The
watershed
drains
the
area
bounded
by
Bayview
Hill,
McLaren
Ridge,
and
San
Bruno
Mountain.
The
two
main
drainages
of
the
watershed
are
Visitacion
Creek
and
Guadalupe
Creek,
which
originate
in
the
upland
areas
to
the
west
and
drain
toward
San
Francisco
Bay.
Visitacion
Valley
has
been
divided
into
two
unnamed
subwatersheds
due
to
the
fact
that
the
northern
portion
is
pumped
northward
into
the
San
Francisco
combined
sanitary/stormwater
sewer
system.
The
southern
portion,
which
includes
Visitacion
Creek,
drains
by
gravity
to
San
Francisco
Bay,
but
much
of
it
is
channelized.
Guadalupe
Creek
also
drains
by
gravity
to
the
Bay
via
Brisbane
Lagoon.
Pursuant
to
the
provisions
of
CEQA,
the
Draft
EIR
analyzes
physical
changes
to
the
environment
that
would
result
from
proposed
Baylands
development,
including
impacts
of
site
remediation
and
grading,
infrastructure
construction
and
operation,
provision
of
water
supply,
and
land
use
development
and
operations.
Because
specific
impacts
of
offsite,
up-
slope,
or
upstream
“polluters”
wou
ld
not
be
a
result
of
proposed
Project
site
development,
such
analysis
is
not
provided
in
the
Draft
EIR,
although
the
effects
of
these
upstream
uses
are
recognized
as
part
of
the
Draft
EIR’s
existing
conditions.
16
On
April
18,
2001,
the
RWQCB
issued
Order
No.
01-041
requiring
the
former
Brisbane
landfill
to
be
brought
into
compliance
with
Title
27
requirements.
Brisbane
Baylands
Final
EIR
2.9.1-91
May
2015