2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
Industrial
Park,
soils
shall
be
tested
for
likely
constituents
of
concern
based
on
the
site’s
use
pursuant
to
the
requirements
of
the
RWQCB.
Human
health
risk
assessment(s)
for
sites
proposed
for
demolition
shall
be
prepared
based
on
the
future
uses
of
the
area
approved
by
the
City
of
Brisbane.
Should
risks
to
human
health
be
identified,
remediation
to
the
risk-based
remediation
standards
set
by
the
RWQCB
shall
be
completed
prior
to
initiating
grading
or
other
onsite
development.
Conclusion
with
Mitigation:
With
implementation
of
Mitigation
Measure
4.G-2j
,
hazards
from
potential
contamination
within
the
Bayshore
Industrial
Park
would
be
reduced
to
less
than
significant.
Human
contact
with
the
surface
water
within
the
lagoon
would
not
be
permitted
pursuant
to
the
Biological
Resources
mitigation
measures
set
forth
in
the
Draft
EIR.
The
water
quality
of
the
Lagoon
will
be
improved
once
the
Baylands
Project
site
is
remediated,
Title
27
landfill
closure
is
completed,
and
best
management
practices
are
in
place
for
stormwater
pollution
and
prevention.
That
said,
CEQA
does
not
require,
nor
does
the
City
have
the
authority
to
require,
mitigation
measures
for
impacts
not
created
by
the
Project,
such
as
existing
water
quality
in
the
Lagoon.
Currently
proposed
remedial
activities
at
OU-2
include:
(1)
excavation
of
approximately
16,000
CY
of
TPH
contaminated
soil
and
1,000
CY
of
VOC
contaminated
soil
for
offsite
disposal,
(2)
excavation
of
approximately
37,000
CY
of
TPH
contaminated
soil
for
onsite
treatment
and
reuse,
and
(3)
excavation
of
12,000
CY
of
TPH
contaminated
soil
for
onsite
reuse.
Excavation
of
soil
impacted
with
either
TPH
or
VOCs
will
capture
other
constituents,
including
lead.
Once
development
plans
for
the
Project
have
been
finalized
an
updated
human
health
risk
assessment
will
be
prepared
to
evaluate
development-specific
exposure
pathways.
The
human
health
risk
assessment
will
identify
needed
investigations
and
assessments,
and
provide
risk-based
cleanup
goals
that
are
protective
of
human
health
and
the
environment
that
will
determine
site
cleanup.
The
remedial
action
currently
proposed
within
the
Draft
EIR
for
the
surface
water
management
system
as
part
of
the
remediation
of
the
Brisbane
Landfill
includes
restructuring
the
Central
Drainage
Channel
and
installing
a
layered
lined
system
that
includes
a
barrier
membrane
to
ensure
the
Central
Drainage
Channel
and
Brisbane
Lagoon
are
not
impacted
from
leachate
migration
from
the
landfill.
The
most
effective
remedial
action
for
addressing
contaminated
sediments
in
a
water
body
is
to
eliminate
the
source
and
secondary
source
of
contamination
and
allow
naturally
capping
of
the
contaminated
sediments
by
the
deposition
of
additional
sediments.
Brisbane
Baylands
Final
EIR
2.9.1-61
May
2015
Previous Next