2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
the
volume
of
import
being
accepted.
Sampling
requirements
will
be
established
by
the
RWQCB
as
part
of
Title
27
closure
requirements.
All
materials
that
will
be
used
to
form
a
permanent
landfill
cap
will
be
screened
to
ensure
that
they
meet
the
regulatory
standards
of
Title
27
and
the
RWQCB.
BBCAG-105
BBCAG-106
BBCAG-107
[See page
5-107 for the original comment]
See
Response BBCAG-104.
[See page
5-107 for the original comment]
See
Response BBCAG-104
.
[See page
5-107 for the original comment]
The
description
of
the
artificial
fill
on
Draft
EIR
page
4.G-19
was
based
on
observations
made
from
borings
that
were
part
of
previous
geotechnical
investigations
and
were
not
meant
to
characterize
the
waste
within
the
landfill
of
to
provide
a
comprehensive
list
of
the
landfill
waste
(see
Draft
EIR
Section
4.H,
Hazards
and
Hazardous
Materials
,
for
a
more
detailed
characterization
of
waste
within
the
landfill).
However,
to
further
characterize
the
materials
received
by
the
landfill,
the
following
information
from
the
Hazardous
Materials
Summary
Report
for
the
Brisbane
Landfill
(contained
in
Appendix
H
of
the
Draft
EIR)
is
added
to
paragraph
4
on
page
4.G-19
of
the
EIR:
Artificial
Fill
-
Landfill
.
Non-engineered
fill
material
incudes
soils,
concrete,
bricks,
tires,
steel,
and
wood.
The
soil
types
range
from
sandy
clay
to
gravel
with
sand
and
range
in
thickness
from
6
to
40
feet.
The
majority
of
fill
was
composed
of
silty
clay
and
concrete
matrix.
A
clean
soil
layer
approximately
ten
feet
thick
overlies
the
waste.
The
landfill
was
used
for
the
disposal
of
solid
wastes
composed
principally
of
domestic,
industrial
and
shipyard
waste,
sewage,
and
rubble
(Geosyntec,
2012c).
Thickness
ranges
from
20
to
35
feet.
BBCAG-108
[See page
5-107 for the original comment]
The
text
on
page
4.G-19
provides
a
description
of
“Waste”
as
a
geologic
unit,
and
is
not
intended
to
characterize
the
wastes
within
the
former
landfill
onsite.
As
noted
above,
refuse
from
residential;
commercial;
industrial
activities
including
shipyard
waste;
and
construction
rubble,
tires,
and
sewage
were
placed
in
the
landfill
prior
to
cessation
of
operations
in
1967.
A
more
complete
description
of
the
Brisbane
Landfill
is
presented
in
the
Draft
EIR
on
pages
4.G-23
through
4.G-34.
[See page
5-107 for the original comment]
Different
terminology
has
been
used
throughout
the
history
of
assessments,
investigations,
and
remedial
activities
by
different
consultants
for
the
geologic
formations
and
hydrology
of
the
Baylands.
The
Draft
EIR
provides
the
terminology
used
in
the
original
reports.
Basically,
fill
comprised
of
solid
waste
accepted
by
the
landfill
was
placed
on
top
of
earthquake
rubble
that
was
placed
on
top
of
marine
sediments
to
form
land.
Soil
has
been
placed
on
top
of
the
solid
waste
to
prevent
contact
with
the
waste.
BBCAG-109
Brisbane
Baylands
Final
EIR
2.9.1-37
May
2015