2.
Response
to
Comments
2.8
Individual
Responses
to
Comments
from
Municipalities
the
Brisbane
Baylands
“as
a
potential
site
for
a
storage
and
maintenance
facility.”
CHSRA’s
2012
letter
stated
that
as
part
of
its
2012
Revised
Busin
ess
Plan,
the
Authority
“has
changed
the
basic
assumptions
for
High
-Speed
Train
(HST)
construction
and
operation,”
reducing
the
fleet
size
to
be
stored
on
the
Peninsula
by
more
than
half,
thereby
reducing
the
required
storage
yard
size
and
footprint.
Thus,
the
100-
acre
facility
described
in
the
Authority’s
2010
“Supplemental
Alternatives
Analysis”
and
cited
in
Comment
SFOM
-4
does
not
reflect
the
Authority’s
most
recent
business
plan,
and
may
be
far
larger
than
actually
needed.
The
Authority’s
2012
NOP
response
letter
states
that
the
Authority
is
“currently
re-examining
the
corridor
to
identify
site
specific
and
operationally
feasible
locations
which
will
meet
maintenance
and
storage
requirements.
Suitable
potential
sites,
in
addition
to
Brisbane,
will
be
evaluated
through
the
NEPA
and
CEQA
environmental
processes.”
The
document
cited
in
Comment
SFOM-4,
Summary
of
Requirements
for
O&M
Facilities
(April
30,
2013),
states,
“
It
should
be
noted
that
the
siting
of
the
O&M
facilities
has
not
been
determined
at
this
time.
For
illustrative
purposes
only,
hypothetical
locations
of
each
facility
are
shown
in
Figure
1
and
Table
1
for
the
progression
of
the
phased
development
of
the
Project.”
Thus,
it
is
clear
that
the
Authority
does
not
have
a
recommended
location
for
the
high-speed
rail
maintenance
yard,
as
Comments
SFOM-4
and
SFOM-7
appear
to
assert.
Table
1
of
the
high-speed
rail
O&M
needs
analysis
is
labeled
“Summary
of
O&M
Facilities
(For
Illustrative
Purposes
Only),”
and
identifies
the
need
for
an
approximate
100-acre
site
at
a
San
Francisco
location.
Neither
Brisbane
nor
the
Baylands
are
mentioned
in
Summary
of
Requirements
document.
Figure
1
from
the
2013
Summary
of
Requirements
for
O&M
Facilities
is
included
below.
As
shown,
neither
Brisbane
nor
the
Baylands
are
identified
in
that
figure.
Brisbane
Baylands
Final
EIR
2.8.3-2
May
2015
Previous Next