Conclusion:
As
described
in
the
WSIP
Program
EIR,
a
significant
impact
on
meadow
and
alluvial
features
in
the
reach
of
the
Tuolumne
River
between
Hetch
Hetchy
Reservoir
(O’Shaughnessy
Dam)
and
Don
Pedro
Reservoir,
particularly
within
the
Poopenaut
Valley
would
result
from
diversions
of
water
being
held
in
the
Hetch
Hetchy
Reservoir.
Thus,
the
proposed
water
transfer
agreement
with
OID,
in
combination
with
the
SFPUC
diversions
addressed
in
the
WSIP
Program
EIR
would
result
in
a
cumulatively
significant
impact,
although
mitigation
measures
set
forth
in
the
WSIP
Program
EIR,
including
a
program
of
controlled
releases
(WSIP
FEIR
Mitigation
Measure
5.3.7-2),
would
be
implemented
to
mitigate
impacts
of
that
project
to
a
less
than
significant
level.
The
text
at
the
bottom
of
page
6-21
would
be
revised
to
read
as
follows:
Contributions
of
DSP,
DSP-V,
CPP,
and
CPP-V
Scenarios
to
Cumulative
Impacts
Sensitive
upland
habitat
and
special
status
plant
and
butterfly
species
occur
within
the
Project
Site
only
on
Icehouse
Hill,
which
is
being
preserved
in
open
space.
In
addition,
specific
mitigation
is
proposed
for
bird
strike
impacts
to
increase
nighttime
visibility
of
buildings.
Thus,
Project
Site
development
would
not
make
a
cumulative
considerable
contribution
to
the
significant
cumulative
impact
described
above
in
relation
to
habitats
within
the
vicinity
of
the
Baylands.
Because
adverse
impacts
on
meadow
and
alluvial
features
in
the
reach
of
the
Tuolumne
River
between
Hetch
Hetchy
Reservoir
(O’Shaughnessy
Dam)
and
Don
Pedro
Reservoir,
particularly
within
the
Poopenaut
Valley,
would
result
from
diversions
as
small
as
2
mgd,
the
amount
of
the
diversion
in
the
proposed
water
supply
agreement,
a
significant
impact
was
determined
to
result
from
the
proposed
water
supply
agreement
.
Conclusion:
Because
Project
Site
development
would
not
result
in
loss
of
sensitive
upland
habitat
areas
or
impact
special
status
species,
it
would
not
make
a
cumulatively
considerable
contribution
to
the
significant
cumulative
impact
described
above.
However,
a
significant
impact
was
determined
to
result
from
the
proposed
water
supply
agreement.
The
proposed
water
supply
agreement
would
make
a
cumulatively
considerable
contribution
to
the
significant
cumulative
impact
described
for
the
reach
of
the
Tuolumne
River
between
Hetch
Hetchy
Reservoir
(O’Shaughnessy
Dam)
and
Don
Pedro
Reservoir
.
However,
implementation
of
the
mitigation
measures
aimed
at
providing
pulse
flows
through
the
Poopenaut
Valley
by
the
SFPUC
(WSIP
EIR)
and
by
the
City
of
Brisbane
(Baylands
EIR)
would
reduce
cumulative
impacts
of
the
proposed
water
supply
agreement
on
biological
resources
within
the
Poopenaut
Valley
to
less
than
significant.
Future
Project-Level
CEQA
Review
Additional,
project-level
CEQA
review
of
the
proposed
OID
water
transfer
would
be
required
prior
to
its
consideration
by
the
City.
In
crafting
the
water
transfer
agreement,
Brisbane
would
work
closely
with
OID,
MID,
and
the
SFPUC
to
understand
their
detailed
system
operations
and
conveyance
capacity
availability
and
develop
the
draft
operational
details
of
how
the
transfer
would
be
implemented
through
MID
and
the
SFPUC
and
would
evaluate
the
proposed
operations
Brisbane
Baylands
Final
EIR
2.4-88
May
2015
Previous Next