2.
Response
to
Comment
2.4
Master
Responses
to
Comments
Hetchy
Reservoir
that,
in
some
years,
could
lead
to
flow
changes
that
could
adversely
affect
streamside
meadows
and
other
alluvial
deposits.
The
SFPUC
is
implementing
adopted
WSIP
PEIR
mitigation
in
order
to
reduce
potential
impacts
on
the
streamside
meadows
and
other
alluvial
deposits
along
the
Tuolumne
River
below
this
reservoir
to
less-than-significant
levels.
The
SFPUC’s
mitigation
action
will,
in
effect,
address
this
impact
and
remedy
it
such
that
it
would
not
continue
to
be
an
impact
issue
for
a
transfer
such
as
proposed
between
OID
and
Brisbane.
However,
because
the
OID-Brisbane
water
transfer
would
contribute
to
this
impact,
this
impact
is
considered
to
be
significant
for
the
OID-Brisbane
water
transfer
element
of
proposed
Baylands
development,
and
Mitigation
Measure
4.O-1b
would
require
Brisbane
to
contribute
a
portion
of
the
water
purchased
from
OID
to
be
used
by
SFPUC
for
controlled
releases
from
Hetch
Hetchy
Reservoir.
Thus,
Brisbane
would
mitigate
the
impacts
of
the
OID
water
transfer
to
marsh
areas
in
the
Poopenaut
Valley
to
a
less
than
significant
level.
See
revisions
to
Mitigation
Measure
4.O-1b
in
Final
EIR
Chapter
3.0.
As
noted,
this
measure
to
shape
the
flow
releases
from
Hetch
Hetchy
Reservoir
can
on
l
y
be
implemented
by
the
SFPUC
as
the
owner
and
operator
of
the
reservoir.
Brisbane
would
contractually
commit
to
contributing
water
this
measure
that
the
SFPUC
is
already
in
the
process
of
implementing
(see
Response SFPUC-10).
Recognizing
the
potential
for
impacts
on
meadow
and
alluvial
features
along
the
Tuolumne
River
in
the
reach
of
the
river
between
Hetch
H
etchy
Reservoir
(O’Shaughnessy
Dam)
and
Don
Pedro
Reservoir,
with
particular
impact
on
meadow
and
alluvial
features
in
this
reach,
including
the
Poopenaut
Valley,
the
final
paragraph
on
page
6-20
of
the
Draft
EIR
is
revised
to
read
as
follows.
Would
the
Project,
in
conjunction
with
past,
present,
and
reasonably
foreseeable
future
projects,
result
in
significant
cumulative
impacts
on
biological
resources?
The
geographic
context
for
analysis
of
cumulative
impacts
on
biological
resources
encompasses
the
area
within
the
Brisbane
city
limits
and
surrounding
neighborhoods,
areas
that
are
biologically
linked
(by,
for
example,
birds,
bats,
fish
or
terrestrial
wildlife)
to
the
Baylands,
and
ecologically
similar
areas
throughout
the
San
Francisco
Peninsula
and
within
a
five-mile
radius
of
the
Project
Site
(in
relation
to
migratory
species).
Projects
within
the
geographic
scope
of
analysis
include
a
variety
of
proposed
urban
land
uses
as
listed
in
Table
6-2,
above,
and
include
Cumulative
Projects
1-16
and
18-22.
The
geographic
context
for
analysis
of
cumulative
impacts
on
biological
resources
also
encompasses
the
reach
of
the
Tuolumne
River
between
the
Hetch
Hetchy
Reservoir
(O’Shaughnessy
Dam)
and
Don
Pedro
Reservoir,
with
particular
emphasis
on
the
meadow
and
alluvial
features
in
this
reach,
including
the
Poopenaut
Valley.
The
following
text
is
added
to
page
6-
21,
immediately
before
the
section
entitled
“Contributions
of
DSP,
DSP-V,
CPP,
and
CPP-
V
Scenarios
to
Cumulative
Impacts.”
Cumulative
Impacts
along
the
Tuolumne
River
As
discussed
in
Section
4.O,
as
part
of
the
proposed
water
transfer
from
OID,
the
SFPUC
would
hold
2,400
AFY
in
Hetch
Hetchy
Reservoir
instead
of
releasing
it
down
the
Tuolumne
River
for
capture
by
MID/Turlock
Irrigation
District
(TID)
in
New
Don
Pedro
Brisbane
Baylands
Final
EIR
2.4-86
May
2015
Previous Next