2.
Response
to
Comment
2.4
Master
Responses
to
Comments
proposed
for
the
Baylands
do
not
typically
transport,
use,
or
generate
substantial
amounts
of
hazardous
materials.
In
addition,
remediation
requirements
would
be
required
to
avoid
creation
of
new
“ingestion
pathways”
that
could
affect
existing
uses
in
surrounding
communities.
Finally,
mitigation
measures
set
forth
in
Draft
EIR
Section
4.G
would
ensure
that
impacts
would
be
less
than
significant.
Surface
Water
and
Hydrology
Draft
EIR
Section
4.H,
Surface
Water
Hydrology
and
Water
Quality
,
analyzes
drainage,
water
quality,
groundwater,
and
flooding
impacts
on
surrounding
land
uses
from
development
of
the
Project
Site.
Visitacion
Valley
is
located
uphill
from
the
Project
Site,
so
surface
runoff
and
flooding
from
Baylands
development
would
not
be
an
issue.
Land
Use
As
stated
above,
placement
of
uses
adjacent
or
in
proximity
to
each
other
without
adequate
buffer
areas
or
contrary
to
General
Plan
policy
or
zoning
ordinance
requirements
would
be
considered
to
be
a
land
use
incompatibility.
The
types
of
uses
proposed
under
the
DSP,
DSP-V,
and
CPP
scenarios
include
residential
(DSP
and
DSP-V
scenarios),
commercial
office,
retail,
entertainment,
and
institutional
uses
that
would
typically
not
require
buffering
from
the
residential
and
commercial
uses
present
within
Visitacion
Valley.
8
The
proposed
expansion
of
the
Recology
facility
would
occur
immediately
adjacent
to
existing
residential
uses
within
Visitacion
Valley.
Because
these
uses
are
adjacent
to
each
other,
providing
physical
separation
between
Recology
and
Visitacion
Valley
is
not
feasible.
However,
site
planning
for
the
Recology
facility
would
be
undertaken
in
a
manner
that
takes
impacts
on
the
surrounding
community
into
consideration.
Noise
Draft
EIR
Section
4.J,
Noise
and
Vibration
,
evaluates
existing
residential
uses
within
Visitacion
Valley
as
sensitive
receptors
in
its
analysis
of
operational
and
construction
noise
and
vibration
impacts
(see
Figure
4.J-2).
Mitigation
measures
have
been
identified
in
Section
4.J
to
reduce
impacts
related
to
operational
noise
from
both
stationary
and
mobile
sources
(Mitigation
Measures
4.J-3a
and
4.J-3b)
and
construction
noise
(Mitigation
Measures
4.J-4a
and
4.J-4b).
As
discussed
in
Section
4.J,
impacts
would
be
mitigated
to
less-than-significant
levels
for
offsite
receptors,
including
those
in
Visitacion
Valley.
There
would
be
significant
unavoidable
impacts
during
pile-driving
activities
associated
with
later
phases
of
the
DSP
and
DSP-V
scenarios,
but
these
activities
would
only
affect
residences
built
onsite
within
the
first
phases
of
development
(not
offsite
receptors).
Traffic
Proposed
development
within
the
Baylands
would
not
physically
block
or
hinder
normal
or
emergency
access
to
uses
within
Visitacion
Valley.
However,
Section
4.N,
Traffic
and
Circulation
,
identifies
a
number
of
significant
impacts
on
the
circulation
network
surrounding
the
8
While
the
uses
within
buildings
developed
in
the
Baylands
would
not
typically
require
buffer
areas,
as
discussed
above
in
relation
to
aesthetics
impacts,
the
height
and
intensity
of
development
proposed
within
the
Baylands
would
be
out
of
scale
with
proximate
development
in
Visitacion
Valley.
Brisbane
Baylands
Final
EIR
2.4-54
May
2015