2.
Response
to
Comments
2.10
Individual
Responses
to
Comments
from
Individuals
Code
for
removal
or
remedial
action
pursuant
to
Chapter
6.8
(commencing
with
Section
253000)
of
Division
20
of
the
Health
and
Safety
Code.
(C)
The
site
of
one
or
more
buried
above
ground
pipelines
which
carry
hazardous
substances,
acutely
hazardous
materials,
or
hazardous
wastes,
as
defined
in
Division
20
of
the
Health
and
Safety
Code.
Within
500
feet
of
the
edge
of
the
closest
traffic
lane
of
a
freeway
or
other
busy
traffic
corridor.
(D)
(2)
The
lead
agency
has
notified
in
writing
and
consulted
with
the
county
or
city
administering
agency
(as
designated
pursuant
to
Section
25502
of
the
Health
and
Safety
Code)
and
with
any
air
pollution
control
district
or
air
quality
management
district
having
jurisdiction
to
identify
facilities
within
one-fourth
mile
of
the
proposed
school
site
which
might
reasonably
be
anticipated
to
emit
hazardous
emissions
or
handle
hazardous
or
acutely
hazardous
material,
substances
or
waste.”
Siting
of
school
facilities
is
the
statutory
responsibility
of
school
districts,
and
must
comply
with
the
applicable
regulatory
requirements
identified
in
Response
As
stated
on
Draft
EIR
page
specific
siting
studies
for
proposed
school
facilities
would
need
to
be
undertaken
in
relation
to
site
remediation
and
noise
conditions
prior
to
acquiring
land
for
school
facilities.
As
discussed
in
Section
4.G,
Hazards
and
Hazardous
Materials
,
remedial
actions
and
cleanup
levels
for
parcels
within
the
former
landfill
and
railyard
portions
of
the
Baylands
would
be
finalized
with
preparation
of
Remedial
Action
Plans
and
a
formal
landfill
closure
plan.
The
Remedial
Action
Plans
and
may
require
deed
restrictions
on
certain
uses,
including
schools,
to
limit
human
exposures
to
contaminants
above
levels
considered
protective
of
unrestricted
use.
Therefore,
the
results
of
the
remediation
process
may
also
preclude
construction
of
schools
within
certain
areas
of
the
Baylands
Project
Site.
Regarding
previous
land
uses,
CEQA
requires
that
the
impacts
of
a
proposed
project
be
analyzed
against
the
existing
conditions/environmental
setting
at
the
time
the
Draft
EIR
is
prepared.
The
existing
environmental
baseline
used
for
the
Draft
EIR
is
2010
for
the
reasons
explained
7.
Land
uses
that
may
have
been
in
existence
prior
to
that
year
could
contribute
to
the
various
environmental
conditions
onsite,
both
on
the
surface
and
below
ground,
such
as
groundwater
pollution,
or
solid
or
hazardous
waste
accumulation.
Any
residual
impacts
of
land
uses
operating
prior
to
2010
and
the
various
hazardous
materials
studies
undertaken
for
the
Baylands
are
captured
in
the
topical
analyses
in
the
Draft
EIR
as
part
of
the
existing
environmental
setting.
Brisbane
Baylands
Final
EIR
2.10.16-8
May
2015