2.
Response
to
Comments
2.10
Individual
Responses
to
Comments
from
Individuals
requirement
is
placed
on
the
first
specific
plan
within
the
area,
and
not
on
the
City,
which
sponsored
preparation
of
the
CPP
and
CPP-V
scenarios.
It
is
also
important
to
note
that
the
General
Plan
does
not
require
that
a
specific
plan
must
be
prepared
concurrent
with
a
concept
plan
for
the
Baylands.
Thus,
the
City
Council
designated
the
CPP
and
CPP-V
concept
plan
scenarios
for
study
in
this
EIR
at
an
equal
level
of
detail
to
the
developer-sponsored
plans
(DSP
and
DSP-V
scenarios)
in
2010
without
also
preparing
a
specific
plan
for
the
CPP
and
CPP-V
scenarios.
This
comment
is
also
incorrect
in
its
characterization
of
Figure
4.H-4.
The
large
purple
area
shown
in
that
figure
is
not
a
wetland,
but
is
the
area
that
would
be
at
risk
of
flooding
following
1.4
meters
(55
inches)
of
sea
level
rise.
Figure
4.C-1
illustrates
existing
wetlands
within
the
Baylands
Project
Site.
Figure
4.C-1
identifies
habitat
types
within
the
Baylands,
and
clearly
indicates
that
no
wetlands
are
present
along
the
proposed
Geneva
Avenue
extension.
See
also
9
for
discussion
of
the
location
of
wetlands
within
the
Baylands
Project
Site.
The
extension
of
Geneva
Avenue
from
its
current
terminus
at
Bayshore
Boulevard
to
the
US
101
freeway
is
identified
in
the
1994
Brisbane
General
Plan
(e.g.,
Policy
340.1
calling
for
an
analysis
of
the
feasibility
of
that
extension,
including
an
estimate
of
costs).
The
Geneva
Avenue
extension
is
also
included
in
the
recommendations
of
a
bi-county
study
conducted
by
San
Mateo
County,
the
cities
of
Brisbane
and
Daly
City,
and
the
City
and
County
of
San
Francisco.
As
documented
in
Section
4.N
of
the
Draft
EIR,
the
need
for
the
Geneva
Avenue
extension
results
from
the
combination
of
development
proposed
within
the
Baylands,
Daly
City,
and
San
Francisco.
While
Brisbane
has
participated
in
the
Bi-County
transportation
study,
the
City
retains
the
discretion
to
provide
for
the
Geneva
extension
through
the
Baylands
or
not.
The
impacts
of
traffic
from
each
development
scenario
on
the
surrounding
roadway
and
freeway
system
are
fully
addressed
in
Section
4.N
of
the
Draft
EIR.
The
comment
is
incorrect
in
its
assertion
that
“any
possible
traffic
mitigation”
has
been
“subsumed
under
the
need
for
specific
plans,
of
which
there
are
none.”
See
for
discussion
of
the
proposed
Brisbane
Baylands
Specific
Plan
for
the
DSP
and
DSP-V
scenarios.
As
clearly
outlined
in
Section
4.N
of
the
Draft
EIR,
a
total
of
26
mitigation
measures
are
proposed
to
address
transportation-related
impacts:
Mitigation
Measures
4.N-1a
through
4.N-1h,
4.N-3a
through
4.N-3h,
4.N-4,
4.N-5,
4.N-7,
4.N-9,
4.N-10,
4.N-11,
4.N-12,
4.N-13,
and
4.N-17.
Brisbane
Baylands
Final
EIR
2.10.16-6
May
2015