2.
Response
to
Comments
2.10
Individual
Responses
to
Comments
from
Individuals
Dilworth
2-10
[See page
5-551 for the original comment]
See
Master Response 15
for
discussion
of
the
adequacy
of
existing
studies
for
use
in
the
Draft
EIR.
Tidal
influence
of
groundwater
is
documented
along
the
margin
of
the
landfill
but
is
not
significant
across
the
site.
Seasonal
influence
of
surface
water
runoff
is
documented
in
the
tree-lined
channel
in
the
northern
portion
of
the
site,
but
there
is
not
a
significant
connection
between
the
water
in
the
tree
lined
channel
and
groundwater
underlying
the
site.
The
shallow
groundwater
gradient
has
been
identified
as
easterly
towards
San
Francisco
Bay
and
southerly
towards
Brisbane
Lagoon;
however
the
shallow
groundwater
is
not
in
communication
with
the
San
Francisco
Bay.
Dilworth
2-11
[See page
5-551 for the original comment]
This
comment
states
the
number
of
monitoring
stations
within
the
former
landfill
portion.
It
does
not
raise
any
significant
environmental
issues
regarding
the
adequacy
of
the
Draft
EIR
or
its
analyses
and
conclusions.
Dilworth
2-12
[See page
5-52 for the original comment]
Mitigation
Measure
4.G-2a
requires
that
Title
27
landfill
closure
be
completed
prior
to
issuance
of
a
building
permit
within
the
former
landfill
area,
remediation
activities
be
completed
within
OU-1
prior
to
issuance
of
a
building
permit
within
OU-1,
and
that
remediation
activities
be
completed
within
OU-2
prior
to
issuance
of
a
building
permit
within
OU-2.
Dilworth
2-13
[See page
5-552 for the original comment]
The
eastern
portion
of
the
Kinder
Morgan
facility
sits
on
the
former
Brisbane
Landfill.
The
current
facility
consists
of
21
aboveground
storage
tanks
(ASTs)
constructed
on
the
western
portion
of
the
facility
on
bedrock
(Arcadis
2014).
See
Master Response 19
for
discussion
of
contamination
related
to
hydrocarbon
releases
from
the
tank
farm
and
RWQCB
requirements
for
site
remediation.
As
identified
on
Draft
EIR
page
4.G-57,
there
are
two
Spills,
Leaks
Investigation
and
Cleanup
(SLIC)
and
Leaking
Underground
Storage
Tank
(LUST)
sites
that
are
within
the
Project
Site
and
are
still
open
cases:
250
and
350
Industrial
Way.
Dilworth
2-14
[See page
5-552 for the original comment]
All
future
construction
will
be
required
to
meet
California
Building
Code
requirements,
including
structural
design
requirements
for
foundations
based
on
site-specific
soils
testing.
Meeting
such
requirements
will
reduce
potential
impacts
of
construction
on
soils
with
low
load-bearing
capacity
to
less
than
significant
levels.
See
Master Response
5
for
discussion
of
compliance
with
the
law
as
mitigation
under
CEQA.
Dilworth
2-15
[See page
5-552 for the original comment]
The
priority
pollutant
metals
(PPM)
tested
in
the
seven
surface
water
samples
collected
from
the
interior
drainage
channel
during
high
and
low
tides
were
antimony,
arsenic,
beryllium,
cadmium,
chromium,
copper,
lead,
mercury,
nickel,
selenium,
silver,
thallium
and
zinc.
Brisbane
Baylands
Final
EIR
2.10.3-8
May
2015
Previous Next