2.
Response
to
Comments
2.10
Individual
Responses
to
Comments
from
Individuals
Baylands
Draft
EIR
was
provided
to
the
San
Mateo
County
Health
System
as
part
of
the
public
distribution
of
the
Draft
EIR
for
public
and
agency
review.
The
San
Mateo
County
Health
System
did
not
comment
on
the
Draft
EIR.
Dilworth
1-24
[See page
5-550 for the original comment]
Please
see
Response Dilworth
1-12
regarding
remedial
activities
conducted
at
OU-1.
Dilworth
1-25
[See page
5-550 for the original comment]
Please
see
Response Dilworth
1-17.
2.10.3.2
Comments
on
Draft
EIR
Appendix
H.2,
Hazardous
Materials
Summary
Report
–
Brisbane
Landfill
Dilworth
2-1
[See page
5-551 for the original comment]
The
former
Brisbane
Landfill
ceased
accepting
solid
wastes
in
1967.
The
term
“clean
soil”
is
a
common
term
used
in
the
construction
industry
to
denote
soils
that
are
free
of
rubble
and
construction
debris.
As
used
in
the
Draft
EIR,
it
refers
to
the
20
to
30
feet
deep
layer
of
soil
used
as
final
cover
over
the
landfill
to
prevent
human
contact
with
refuse
from
residential,
commercial,
industrial
activities
including
shipyard
waste,
construction
rubble,
tires,
and
sewage.
Refuse
from
residential,
commercial,
and
industrial
activities
including
shipyard
waste;
construction
rubble;
tires;
and
sewage
were
placed
in
the
landfill
prior
to
cessation
of
operations
in
1967.
A
more
complete
description
of
the
Brisbane
Landfill
is
presented
in
the
Draft
EIR
on
pages
4.G-23
through
4.G-34.
The
type
of
waste,
solid
or
liquid,
by
volume
of
total
waste
has
been
estimated
as
73
percent
solid,
25
percent
inert
fill
such
as
earthquake
rubble
and
soil
used
as
daily
cover
and
2
percent
as
liquid.
Dilworth
2-2
[See page
5-551 for the original comment]
See
Master Response 15
for
discussion
regarding
the
adequacy
of
existing
studies
for
use
n
the
Draft
EIR.
The
former
Champion
Speedway,
a
1/8-mile
oval
racetrack,
once
existed
on
the
Baylands
Project
Site
south
of
Beatty
Avenue
and
west
of
the
US
101
freeway
from
approximately
1963
to
1979.
1
The
speedway
held
a
number
of
events
during
this
period,
including
automobile
races
and
demolition
derbies.
After
closure,
the
speedway
was
demolished
and
covered
by
fill.
No
traces
of
this
former
racetrack
currently
exist
within
the
Baylands
Project
Site.
While
this
former
and
temporary
use
on
the
Baylands
Project
Site
is
a
part
of
the
site’s
past,
this
information
does
not
change
the
conclusions
regarding
impacts
to
historic
resources
in
the
Draft
EIR.
Dilworth
2-3
[See page
5-551 for the original comment]
Various
names
are
used
for
Visitacion
Creek
throughout
previous
studies
undertaken
for
the
Baylands,
1
http://www.wediditforlove.com/Champion-1.html.
Accessed
April
16,
2014.
Brisbane
Baylands
Final
EIR
2.10.3-6
May
2015
Previous Next