2.
Response
to
Comments
2.10
Individual
Responses
to
Comments
from
Individuals
12-foot-wide
multiuse
path
with
landscaping
from
the
adjacent
roadway
with
an
8-foot-wide
landscaped
bioswale.
Site
remediation
would
be
a
prerequisite
to
any
use
of
bioswales
within
the
Baylands.
Remediation
of
existing
contamination
within
the
Baylands
along
with
formal
closure
of
the
former
landfill
is
a
prerequisite
to
new
development
within
the
Baylands
as
specified
in
Mitigation
Measure
4.G-2a.
See
Final
EIR
Chapter
3.0
for
revisions
to
mitigation
measures
addressing
the
timing
of
roadway
improvements
to
proposed
development
within
the
Baylands.
General
Plan
Policy
337
requires
specific
plans
prepared
for
development
within
the
Baylands
to
include
“a
phasing
schedule
for
development
to
limit
the
adverse
impacts
of
too
rapid
growth.”
Draft
EIR
Table
4.I-1
concludes
that
the
DSP
and
DSP-V
scenarios
are
inconsistent
with
this
policy
because
the
Brisbane
Baylands
Specific
Plan
prepared
by
the
applicant
for
the
DSP
and
DSP-V
scenarios
“does
not
tie
the
rate
of
land
development
to
the
availability
of
infrastructure,
which
could
lead
to
the
establishment
of
new
uses
outstripping
the
capacity
of
infrastructure
during
initial
phases
of
development
prior
to
project
buildout.”
Table
4.I-1
notes
that
resolving
this
inconsistency
“requires
(1)
establishing
concurrency
requirements;
(2)
establishing
performance
standards
for
public
services,
facilities,
and
infrastructure;
and
(3)
tying
the
pace
of
land
development
to
the
availability
of
services,
facilities,
and
infrastructure.”
To
resolve
this
inconsistency,
Mitigation
Measure
4.I-1
requires
that
either
(1)
the
General
Plan
is
amended
to
include
public
services
and
facilities
performance
standards
and
concurrency
requirements
(all
scenarios);
or
(2)
the
proposed
Specific
Plan
is
modified
to
include
an
infrastructure
phasing
program
that
ties
the
rate
of
land
development
within
the
Project
Site
to
the
availability
of
needed
public
services
and
facilities
(DSP
and
DSP-V
scenarios
only).
In
the
case
of
the
second
option,
any
specific
plan
prepared
for
the
CPP
or
CPP-V
scenario,
should
either
be
selected,
would
be
required
to
be
consistent
with
General
Plan
Policy
337.
To
clarify
that
Mitigation
Measure
4.I-1
includes
tying
the
pace
of
Baylands
development
to
the
availability
of
the
regional
roadway
facilities
proposed
in
the
Bi-County
transportation
study,
Mitigation
Measure
4.N-3f
is
revised
to
read
as
follows.
Mitigation
Measure
4.N-3f:
The
City
of
Brisbane
shall
work
with
the
San
Francisco
County
Transportation
Authority
(SFCTA),
San
Francisco
Municipal
Transportation
Authority
(SFMTA),
and
Caltrans
to
ensure
that
projected
traffic
volumes
are
accounted
for
in
the
design
of
the
Brisbane
Baylands
Final
EIR
2.10.2-6
May
2015