Table
of
Contents
Page
Volume
I
(continued)
2.
Responses
to
Comments
(continued)
2.4.10
Master
Response
10,
Biological
Resources:
Analysis
of
Previous
Actions
That
May
Have
Affected
Wetlands
2.4.11
Master
Response
11,
Cultural
Resources:
Significance
of
Historic
and
Archaeological
Resources
that
May
Be
Found
Onsite
2.4.12
Master
Response
12,
Geology,
Soils,
and
Seismicity:
Adequacy
of
the
Characterization
of
Seismic
Hazards
within
the
Baylands
2.4.13
Master
Response
13,
Hazards
and
Hazardous
Materials:
Review
Process
and
Responsibilities
for
Site
Remediation
and
Title
27
Landfill
Closure
2.4.14
Master
Response
14,
Hazards
and
Hazardous
Materials:
Risk-
Based
Remediation
Standards
2.4.15
Master
Response
15,
Hazards
and
Hazardous
Materials:
Adequacy
of
the
Waste
Characterization
Used
in
the
Draft
EIR
2.4.16
Master
Response
16,
Hazards
and
Hazardous
Materials:
Liability
in
Relation
to
Potential
Hazards;
Indemnification
of
the
City
from
Possible
Future
Loss
of
Property
of
Use
2.4.17
Master
Response
17,
Hazards
and
Hazardous
Materials:
Potential
for
Cross-Contamination
and
Cumulative
Effects
of
Multiple
Toxins
2.4.18
Master
Response
18,
Land
Use:
Is
a
Public
Vote
Required
to
Amend
the
Brisbane
General
Plan?
2.4.19
Master
Response
19,
Land
Use:
Environmental
Impacts
and
Land
Use
Compatibility
in
Relation
to
Specific
Locations
2.4.20
Master
Response
20,
Land
Use:
Environmental
Impacts
and
Land
Use
Compatibility
in
Relation
to
the
Proposed
Recology
Expansion
2.4.21
Master
Response
21,
Public
Services
and
Utilities:
Responsibility
for
Construction
and
Maintenance
of
Public
Facilities
and
Infrastructure
Needed
for
Baylands
Development
2.4.22
Master
Response
22,
Traffic
and
Circulation:
Land
Use
Growth
and
Related
Traffic
Volume
Used
to
Forecast
Baseline
Traffic
under
Cumulative
Conditions
2.4.23
Master
Response
23,
Traffic
and
Circulation:
Impacts
of
the
Proposed
Project
on
US
Highway
101
Mainline
Segments
under
both
Existing
and
Cumulative
Conditions
2.4.24
Master
Response
24,
Traffic
and
Circulation:
Applicability
of
Using
TDM
Measures
to
Mitigate
Impacts
Caused
to
C/CAG’s
CMP
Network
2.4.25
Master
Response
25,
Traffic
and
Circulation:
Jobs
and
Housing
Linkage;
Calculation
of
Internal
Capture
in
Project
Trip
Generation
2.4.26
Master
Response
26,
Traffic
and
Circulation:
Closely
Spaced
Intersections
--
Consideration
of
Queue
Spillback
from
Other
Road
Facilities
at
Study
Intersections
2.4.27
Master
Response
27,
Traffic
and
Circulation:
Inclusion
of
New
Development
in
Existing
Baseline
(No
Project)
Traffic
Volume
2.4.28
Master
Response
28,
Traffic
and
Circulation:
Location
of
the
Bayshore
Caltrain
Station
Assumed
in
the
Draft
EIR
Brisbane
Baylands
Final
EIR
ii
May
2015