It's been a long time coming [1] for Brisbane's newest playground. But, we received word yesterday that the main play equipment had been received yesterday at Playground Unlimited's yard (they Miracle Playsystem's subcontractor for the project), and today, we got confirmation that all the parts were accounted for and secured. It will be arriving on-site on Monday, where Playgrounds Unlimited will be doing the majority of the "dirty work" - punching the post holes and inserting the main posts and some of the decks...and should be finished with that in time for Build Day, happening Wednesday, November 14th! Thank you to those who have expressed interest to wanting to help build the playground - we'll have plenty of volunteers. Take a look at the work that's been done over the past couple weeks:

Project Manager from Playgrounds Unlimited, Jaime Rosas, meets with City Engineer Randy Breault to discuss how best the playbox needs to be expanded in order to meet standards for fall zone areas, given the change Miracle Playsystem's equipment (the steps leading up to the sprial slide were widened by the vendor in September).

The next morning, Playgrounds Unlimited chalked the area, it was approved, and then saw cut.

Here's how it looked after cement was poured, and after the new mow strip was formed (what the rubber surfacing will adhere to).

The new sand area will feature a "rolled lip" edge, so as to keep the sand as contained to the sand area as possible. This area will also have a water spigot for sand and water play.

Mothers of Brisbane Jennifer Bousquet and Jessica Aloft helped draw the arc on the seat wall using colored pencils earlier this week. Sebastian, foreground, also helped. Thank you to Jennifer's husband, Ken, for making the templates that allowed getting the arc, which the stars will be mounted along, to be a breeze!
The swing bays went up on Thursday afternoon. The swings themselves will be hung after the rest of the equipment and surfacing have been installed. (Photo credit: Jessica Aloft)
Brisbane's newest playground will be coming in December. After the equipment itself is all installed, that's when the rubber sufacing will be poured. It will take Playgrounds Unlimited about a week to make the star designs in it and for it fully cure. Signs will be posted and the areas will be barricaded during the time it's curing. We're shooting for a ribbon-cutting ceremony at the Festival of Lights (December 2nd). We'll see how the next couple weeks go and if that can stay as-is. Stay tuned!