City of Brisbane, CA
Published on City of Brisbane, CA ()


Playground Update Week 6

As you may have noticed, the area in front of the seat wall, facing the lawn, now has a pathway consisting of decomposed granite, along with new sod which was laid down earlier this week.

The final result came out quite nicely, especially with the gold fines decomposed granite, which makes for a nice contrast with the new grass:

Of course, a green lawn requires watering to keep looking its best, so as the sprinklers were doing their job, some, like Summer and her owner, took advantage of the cool mist.

Gold stars will be placed on the seat wall towards the end of September, prior to Build Day, but for now, the tracings of the 160 lamacoid/plastic stars can be seen on the vertical side of the wall facing what will be the swing area.

The grand fundraising total from the selling of gold stars came out to $27,660.00!  Thank you to everyone who contributed towards the building of Brisbane's newest playground.  And if you want to help volunteer on Build Day, please keep the weekend of September 29-30 available.  If you have experience with small hand tools, that would be a huge help.  There will be things for kids to help with as well, so feel free to bring the family.  Just let Caroline know so she can keep a good idea of who is coming, and on which days (Saturday or Sunday).  If you haven't already done so, please contact her at ccheung@ci.brisbane.ca.us [1] or (415) 508-2157.  Thank you!

Submitted by City of Brisbane on August 24, 2012, 11:22 am
Powered by Drupal

Source URL:/news/2012-08-24/playground-update-week-6

Links
[1] mailto:ccheung@ci.brisbane.ca.us