At their May 7, 2012 meeting, the City Council unanimously approved the recommended design of the Community Park’s new playground by Miracle Playsystems, the Mothers of Brisbane’s Fundraising Strategy, use of the available funding resources, and staff putting site preparation out to bid. The demolition and off-haul of the current structure and sand (being re-purposed for sand bags) will start after the Fourth of July holiday weekend (July 7-8), thanks to the graciousness of the Brisbane Lions Club. Their work over the span of a couple weekends will save the City $9,000 in total estimated project costs.
The approved design is shown above, which the Parks and Recreation Commission voted to recommend to the City Council at their March 14, 2012 meeting. As you can see, there are some familiar features, such as the large twisty slide and sand, but the design also boasts more new features, such as a dedicated water element for sand and water play, climbing rocks and other strength-building apparatuses, shaded play towers, an enclosed bridge with safety netting, poured-in-place rubber surfacing, and a 3-bay swing set featuring two tot swings, two regular swings, and two therapeutic swings. Near the swing set will be a low seat wall, which, on its vertical sides will feature gold stars with the names of all those who have chosen to donate towards the playground (donations over $1,000 will be honored in a special section on the seat wall).
The Mothers of Brisbane have a goal to raise $17,000 to close the funding gap, but if more than that is raised through the selling of gold stars, it will just mean more resources will then be available for other play initiatives in Brisbane. So get your tax-deductible star orders forms [1] in by the deadline of July 1, 2012 – and see your name in stars when the new playground is unveiled to the Community in mid-late September!
